Experimental investigation on precast tunnel segments under TBM thrust action

被引:39
作者
Meda, Alberto [1 ]
Rinaldi, Zila [1 ]
Caratelli, Angelo [1 ]
Cignitti, Filippo [2 ]
机构
[1] Univ Roma Tor Vergata, Tunnelling Engn Res Ctr, Via Politecn 1, I-00133 Rome, Italy
[2] Astaldi Spa, Rome, Italy
关键词
Tunnels; Segmental lining; Precast segments; Full-scale test; TBM thrust; CONTACT DEFICIENCIES; DESIGN;
D O I
10.1016/j.engstruct.2016.03.049
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
An experimental procedure, useful for the evaluation of the structural behaviour of lining segments subjected to the Tunnel Boring Machine (TBM) thrust is presented in the paper. The study rises from the need to face the practical and rather frequent problem of cracks patterns in tunnels, occurring during the ring installation and in the first following phases of the TBM advance. This phenomenon, generally considered unavoidable, has a strong impact on the tunnel builder both in the economical and policy fields. The proposed set-up allows testing single segments under different loads, applied in different zones, in order to simulate the TBM thrusts, also in the curved stretch of the tunnel. Furthermore, different support conditions can be simulated, in order to account for the frequent situation of imperfect contact between the segments of two next rings. The experimental outcomes allow highlighting the different crack patterns related to the different support conditions, and appear useful for a deeper understanding of the segment behaviour under the TBM thrust. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:174 / 185
页数:12
相关论文
共 22 条
  • [1] [Anonymous], 1986, HERON
  • [2] Burgers R, 2007, PROC MONOGR ENG WATE, P1461
  • [3] Structural behaviour of precast tunnel segments in fiber reinforced concrete
    Caratelli, Angelo
    Meda, Alberto
    Rinaldi, Zila
    Romualdi, Paolo
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2011, 26 (02) : 284 - 291
  • [4] Formation and accumulation of contact deficiencies in a tunnel segmented lining
    Cavalaro, S. H. P.
    Blom, C. B. M.
    Walraven, J. C.
    Aguado, A.
    [J]. APPLIED MATHEMATICAL MODELLING, 2012, 36 (09) : 4422 - 4438
  • [5] Structural analysis of contact deficiencies in segmented lining
    Cavalaro, S. H. P.
    Blom, C. B. M.
    Walraven, J. C.
    Aguado, A.
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2011, 26 (06) : 734 - 749
  • [6] Numerical study on crack problems in segments of shield tunnel using finite element method
    Chen, J. S.
    Mo, H. H.
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2009, 24 (01) : 91 - 102
  • [7] Di Carlo F, 2016, STRUCT CONCR
  • [8] Federation Internationale du Beton, 2013, FIB MOD COD CONCR ST
  • [9] Gettu R, BEFIB 2004, P141
  • [10] ITA AITES, 2000, REC GUID TUNN BOR MA