Optimal parameter estimation of 1-phase and 3-phase transmission line for various bundle conductor's using modified whale optimization algorithm

被引:29
|
作者
Shaikh, Muhammad Suhail [1 ]
Hua, Changchun [1 ]
Raj, Saurav [2 ]
Kumar, Shubash [1 ]
Hassan, Mannan [3 ]
Ansari, Muhammad Mohsin [4 ]
Jatoi, Munsif Ali [5 ]
机构
[1] Yanshan Univ, Inst Elect Engn, Qinhuangdao 066004, Hebei, Peoples R China
[2] Inst Chem Technol, Dept Elect Engn, Marathwada Campus, Jalna, India
[3] Southwest Jiaotong Univ, Sch Elect Engn, Chengdu 610031, Peoples R China
[4] Zhejiang Univ, Dept Elect Engn, Hangzhou, Zhejiang, Peoples R China
[5] Salim Habib Univ, Dept Biomed Engn, Karachi, Sindh, Pakistan
关键词
Modified whale optimization algorithm; Single and three-phase; Capacitance; Inductance; Bundle conductor  Transmission line; Voltage stability; PARTICLE SWARM OPTIMIZATION; HARMONY SEARCH ALGORITHM; IDENTIFY FAULT LOCATION; WATER DROPS ALGORITHM; LEVY FLIGHT; VOLTAGE; WIND;
D O I
10.1016/j.ijepes.2021.107893
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The overhead power line transmits and distributes electricity across large regions it has several conductors on poles. Power system stability analysis and state estimates need a thorough understanding of transmission line parameters. To compute the overhead AC transmission line parameters, authors have proposed a modified whale optimization algorithm based on levy flight from four perspectives: dimension selection, exploration controls, modified encircling prey, and candidate solution choice. The proposed work suggested modified whale opti-mization algorithms to calculate capacitance and inductance per unit length for single-phase and three-phase for the different number of bundle conductors. At first, the performance of the algorithm is evaluated and compared with different optimization techniques on 23 standard benchmark functions that are used to evaluate their abilities to discover optimum solutions. Then, the proposed technique is applied in determining optimal parameter settings of 1-phase and 3-phase overhead transmission lines while considering different combinations of bundle conductors for inductor and capacitor. From the results, it can be concluded that the MWOA technique provides more accuracy and reliability to obtain global or near-global optimal settings of control variables. Also, results reveal the proposed technique has the potent to solve real-world optimization problems and is compet-itive with recent methods
引用
收藏
页数:25
相关论文
empty
未找到相关数据