Economic Viability of Bus Bridging Reserves for Fast Response to Unplanned Passenger Rail Disruption

被引:16
作者
Pender, Brendan [1 ]
Currie, Graham [1 ]
Shiwakoti, Nirajan [2 ]
Delbosc, Alexa [1 ]
机构
[1] Monash Univ, Dept Civil Engn, Inst Transport Studies, Bldg 60, Clayton, Vic 3800, Australia
[2] RMIT Univ, Sch Aerosp Mech & Mfg Engn, Carlton, Vic 3053, Australia
关键词
AMBULANCE LOCATION; RECOVERY;
D O I
10.3141/2537-02
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A new approach explores the economic viability of dedicated bus reserves purely for bus bridging purposes. The approach estimates fleet costs and user benefits of reduced delay by improving the response to unplanned rail disruption. The feasibility of dedicated bus reserves has not been considered in previous research. Sourcing buses for bus bridging purposes is problematic during weekday peak periods, which coincide with the highest demand for rail travel. At all other times spare buses are available. Consequently, a dedicated bus reserve would exist mainly to provide bus bridging in the peak. Results suggest that a dedicated bus bridging reserve can be economically viable. Of 18 corridors studied, a dedicated reserve was feasible for 78 %. Economically viable corridors have a benefit cost ratio ranging between 1.5 and 9.7 (average, 4.5). Reserves were not feasible where existing rail demand, disruption likelihood, or both were low. Sensitivity tests explored viability with more conservative assumptions. In each test, the dedicated bus reserve in most corridors remained economically viable. The research suggests that a dedicated bus reserve should be considered by rail operators worldwide because of strong net economic benefits. However, reserves are a net cost (with no income), so investment must be based on economic, not financial, benefits. This aspect suggests that government authorities, rather than commercial operators, may find a dedicated reserve more feasible. This approach illustrates where reserves might best be allocated to maximize investment returns.
引用
收藏
页码:13 / 22
页数:10
相关论文
共 17 条
[1]  
[Anonymous], 2006, NAT GUID TRANSP SYST, V4
[2]  
[Anonymous], COMPUTERS OPERATIONS
[3]  
[Anonymous], 2014, BUS AND DRIV COSTS
[4]   Ambulance location and relocation models [J].
Brotcorne, L ;
Laporte, G ;
Semet, F .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 147 (03) :451-463
[5]  
Church Richard, 1974, PAPERS REGIONAL SCI, V32, P101, DOI [DOI 10.1007/BF01942293, 10.1007/BF01942293]
[6]   A model for setting services on auxiliary bus lines under congestion [J].
Codina, E. ;
Marin, A. ;
Lopez, F. .
TOP, 2013, 21 (01) :48-83
[7]  
Codina E., 2010, 12 WORLD C TRANSP RE
[8]   New Model for Secondary Benefits of Transit Priority [J].
Currie, Graham ;
Sarvi, Majid .
TRANSPORTATION RESEARCH RECORD, 2012, (2276) :63-71
[9]   The bus bridging problem in metro operations: conceptual framework, models and algorithms [J].
Kepaptsoglou, Konstantinos ;
Karlaftis, Matthew G. .
PUBLIC TRANSPORT, 2009, 1 (04) :275-297
[10]   A rolling horizon approach for disruption management of railway rolling stock [J].
Nielsen, Lars Kjaer ;
Kroon, Leo ;
Maroti, Gabor .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 220 (02) :496-509