A bi-directional Supply Chain Optimization model for reverse logistics

被引:8
作者
Gupta, SM [1 ]
Veerakamolmal, P [1 ]
机构
[1] Northeastern Univ, Lab Responsible Mfg, Dept MIME, Boston, MA 02115 USA
来源
PROCEEDINGS OF THE 2000 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS AND THE ENVIRONMENT | 2000年
关键词
D O I
10.1109/ISEE.2000.857658
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper focuses on Supply Chain Optimization system for reverse logistics. The solution approach employs an adaptation of the Materials Requirements Planning (MRP) technique, termed as Components Requirements Planning, to determine the number of components needed to remanufacture products in each time period throughout the planning horizon.
引用
收藏
页码:254 / 259
页数:6
相关论文
共 12 条
[1]   INTERACTIONS BETWEEN OPERATIONAL-RESEARCH AND ENVIRONMENTAL-MANAGEMENT [J].
BLOEMHOFRUWAARD, JM ;
VANBEEK, P ;
HORDIJK, L ;
VANWASSENHOVE, LN .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 85 (02) :229-243
[2]  
GOLDBERG L, GREEN ELECT GREEN BO
[3]   Demanufacturing of information technology equipment [J].
Grenchus, E ;
Keene, R ;
Nobs, C .
PROCEEDINGS OF THE 1997 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS AND THE ENVIRONMENT - ISEE-1997, 1997, :157-160
[4]  
Guide VDR, 1998, J OPER MANAG, V16, P551, DOI 10.1016/S0272-6963(97)00024-7
[5]   An evaluation of capacity planning techniques in a remanufacturing environment [J].
Guide, VDR ;
Srivastava, R ;
Spencer, MS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (01) :67-82
[6]   Issues in environmentally conscious manufacturing and product recovery: a survey [J].
Gungor, A ;
Gupta, SM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 36 (04) :811-853
[7]   SCHEDULING DISASSEMBLY [J].
GUPTA, SM ;
TALEB, KN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (08) :1857-1866
[8]  
GUPTA SM, 2000, P INT GROUP TECHN CE
[9]  
ISAACS JA, 1997, J IND ECOL, V1, P19
[10]   Disassembly of complex product structures with parts and materials commonality [J].
Taleb, KN ;
Gupta, SM ;
Brennan, L .
PRODUCTION PLANNING & CONTROL, 1997, 8 (03) :255-269