Risk Evaluation of Electric Power Grid Enterprise Related to Electricity Transmission and Distribution Tariff Regulation Employing a Hybrid MCDM Model

被引:5
|
作者
Li, Wenjin [1 ]
Li, Bingkang [1 ]
Fang, Rengcun [2 ]
You, Peipei [3 ]
Zou, Yuxin [2 ]
Xu, Zhao [3 ]
Guo, Sen [1 ]
机构
[1] North China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China
[2] State Grid Hubei Elect Power Co, Econ & Technol Res Inst, Wuhan 430077, Peoples R China
[3] State Grid Energy Res Inst, Dept Finance Accounting & Auditing Res, Beijing 102209, Peoples R China
关键词
electric power grid enterprise risk evaluation; electricity transmission and distribution tariff regulation; fuzzy Best-Worst model; improved fuzzy comprehensive evaluation method; vague set; DECISION-MAKING; RENEWABLE ENERGY; VAGUE SETS; INVESTMENT; PROJECTS; TOPSIS;
D O I
10.3390/math9090989
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
In China, a new-round marketization reform of electricity industry is in progress, and the electricity transmission and distribution tariff reform is the core and important task. Currently, the electricity transmission and distribution tariff regulation has gone to the second round in China, and the electric power grid enterprises are facing a closed-loop regulatory system and an increasingly strict regulatory environment. Therefore, it is urgent to evaluate the risk of electric power grid enterprise that is related to electricity transmission and distribution tariff regulation, which can aid the electricity regulators and electric power grid enterprise operators to manage risk and promote the sustainable development of electric power industry. In this paper, a hybrid novel multi-criteria decision making (MCDM) method combining the fuzzy Best-Worst method (FBWM) and improved fuzzy comprehensive evaluation method based on a vague set is proposed for the risk evaluation of electric power grid enterprise related to electricity transmission and distribution tariff regulation. The risk evaluation index system is built. Subsequently, the FBWM is utilized to determine the optimal weights of electric power grid enterprise risk criteria, and the improved fuzzy comprehensive evaluation method that is based on vague set is employed to rank the comprehensive risk grade of electric power grid enterprise related to electricity transmission and distribution tariff regulation. The risk of a province-level electric power grid enterprise that is located in Northern China is empirically evaluated using the proposed MCDM method, and the result indicates that the overall risk of this province-level electric power grid enterprise belongs to 'High' grade, but it is very close to 'Very High' grade. The results indicate that the proposed hybrid novel MCDM method in this paper is effective and practical. Meanwhile, it provides a new view for the risk evaluation of electric power grid enterprise that is related to electricity transmission and distribution tariff regulation.
引用
收藏
页数:23
相关论文
共 8 条
  • [1] Risk Evaluation of Electric Power Grid Investment in China Employing a Hybrid Novel MCDM Method
    Duan, Yana
    Sun, Yang
    Zhang, Yu
    Fan, Xiaoqi
    Dong, Qinghuan
    Guo, Sen
    MATHEMATICS, 2021, 9 (05) : 1 - 23
  • [2] Comprehensive Performance Evaluation of Electricity Grid Corporations Employing a Novel MCDM Model
    Zhao, Haoran
    Zhao, Huiru
    Guo, Sen
    SUSTAINABILITY, 2018, 10 (07)
  • [3] A refined regulation model for incentive regulation of electric power transmission and distribution
    Liu Faquan
    Zhang Huifeng
    2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 1023 - 1027
  • [4] Research on Evaluation Model of Investment Efficiency of Power Grid Enterprise Under New Electricity Reform
    Zhang Dong
    Nuermaimaiti Ruze
    Song Xiaoyan
    Xu Yu
    Liu Qiong
    2019 3RD INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2019), 2019, 267
  • [5] A combined fuzzy and probability risk evaluation model for electric power grid investments
    Wang, Chengwen
    Tan, Zhongfu
    Li, Li
    2008 THIRD INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES, VOLS 1-6, 2008, : 479 - 483
  • [6] Research on Financial Post-Evaluation of Power Grid Project under the Background of Transmission and Distribution Electricity Price Reform
    Yang, Zhilong
    Liu, Yamin
    Xu, Qinghua
    Shi, Xiaokun
    Liu, Hang
    2019 INTERNATIONAL CONFERENCE ON ADVANCES IN CIVIL ENGINEERING, ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2019, 330
  • [7] Optimal control model of purchase electricity risk for power-supplying company under transmission and distribution separation
    North China Electric Power University, Beijing 102206, China
    Diangong Jishu Xuebao, 2007, 9 (184-190): : 184 - 190
  • [8] A Hybrid MCDM Model for Evaluating the Market-Oriented Business Regulatory Risk of Power Grid Enterprises Based on the Bayesian Best-Worst Method and MARCOS Approach
    Zhang, Zhuola
    Lin, Shiyuan
    Ye, Yingjin
    Xu, Zhao
    Zhao, Yihang
    Zhao, Huiru
    Sun, Jingqi
    ENERGIES, 2022, 15 (09)