Cost allocation model for optimizing supply chain inventory with controllable lead time

被引:46
作者
Ye, Fei [1 ]
Xu, Xuejun [1 ]
机构
[1] S China Univ Technol, Sch Business Adm, Guangzhou 510640, Guangdong, Peoples R China
关键词
Controllable lead time; Supply chain; Stackelberg model; Asymmetric Nash bargaining model; INTEGRATED INVENTORY; QUALITY IMPROVEMENT; STOCHASTIC DEMAND; VENDOR; REDUCTION;
D O I
10.1016/j.cie.2010.03.003
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The coordination issue of a decentralized supply chain composed of a vendor and a buyer is considered in this paper. The vendor offers a single product to the buyer and the lead time can be controllable with adding crashing cost. Two supply chain inventory models with controllable lead time under different decision modes are considered, one is proposed under decentralized model based on Stackelberg model, the other is proposed under centralized model of the integrated supply chain. The solution procedures are also suggested to get the optimal solutions of these two models. In addition, an asymmetric Nash bargaining model based on satisfaction level is also developed to get the best cost allocation ratio between the vendor and the buyer by taking their individual rationalities into consideration. The results of numerical example show that shortening lead time reasonably can reduce inventory cost and the cost allocation model based on satisfaction level developed in this paper is effective. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:93 / 99
页数:7
相关论文
共 24 条
[1]  
[Anonymous], 1985, Decision Systems for Inventory Management and Production Planning
[2]  
[Anonymous], INT J OPERATIONS PRO
[3]   Lead-time reduction in a stochastic inventory system with learning consideration [J].
Ben-Daya, M ;
Hariga, M .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (03) :571-579
[4]   Integrated single vendor single buyer model with stochastic demand and variable lead time [J].
Ben-Daya, M ;
Hariga, M .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 92 (01) :75-80
[5]   INVENTORY MODELS INVOLVING LEAD TIME AS A DECISION VARIABLE [J].
BENDAYA, M ;
RAOUF, A .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1994, 45 (05) :579-582
[6]   Inventory management with variable lead-time dependent procurement cost [J].
Chandra, Charu ;
Grabis, Janis .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2008, 36 (05) :877-887
[7]   Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction [J].
Chang, HC ;
Ouyang, LY ;
Wu, KS ;
Ho, CH .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 170 (02) :481-495
[8]   A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR - A COMMENT [J].
GOYAL, SK .
DECISION SCIENCES, 1988, 19 (01) :236-241
[9]   Some stochastic inventory models with deterministic variable lead time [J].
Hariga, M ;
Ben-Daya, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 113 (01) :42-51
[10]  
Harsanyi J. C., 1972, MANAGE SCI, V18, P80, DOI [10.1287/mnsc.18.5.80, DOI 10.1287/MNSC.18.5.80]