Development of cable maintenance robot for cable-stayed bridges

被引:28
|
作者
Luo, Yun [1 ]
Xie, Shaorong
Gong, Zhenbang
Lu, Tiansheng
机构
[1] Shanghai Univ, Coll Mechatron Engn & Automat, Shanghai, Peoples R China
[2] Shanghai Jiao Tong Univ, Coll Mech Engn, Shanghai 200030, Peoples R China
关键词
robotics; cable bridges; China;
D O I
10.1108/01439910710749627
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - In order to replace the conventional human maintenance of cable-stayed bridges, a robot is designed and constructed for tasks such as cleaning, painting and rust-detecting. Design/methodology/approach - Adopting a modular approach, two kinds of climbing mechanisms, plus a painting mechanism and a rust-detecting method are designed. Findings - A robot that can climb and maintain the cables of cable-stayed bridges has been designed and constructed. It has been proved by experiment that the robot can overcome many disadvantages of conventional human bridge-maintenance, and drastically improve efficiency, cost, and safety. Research limitations/implications - The robot is of industrial size, but a new mechanism requiring less installing time will be designed for the future. Practical implications - The robot has been applied to cables of the Nanpu Bridge and Xupu Bridge in Shanghai. More than 80 cable-stayed bridges and six suspension bridges have been built or are being constructed across large rivers in China alone. This gives an enormous potential market. Originality/value - The cable maintenance robot developed in this paper is the world's first special robot for the cables of cable-stayed bridges.
引用
收藏
页码:303 / 309
页数:7
相关论文
共 50 条
  • [21] The impact of cable spacing on the behavior of cable-stayed bridges
    Al-Rousan, R.
    MAGAZINE OF CIVIL ENGINEERING, 2019, 91 (07): : 49 - 59
  • [22] Determination of the initial cable forces for cable-stayed bridges
    Liang, Zhiguang
    Li, Jianzhong
    Shi, Xianfeng
    Gong Cheng Li Xue/Engineering Mechanics, 2000, 17 (03): : 121 - 126
  • [23] Measuring Methods of Cable Tension in Cable-Stayed Bridges
    Sun, Jiangbo
    Zhao, Zuozhou
    Zhao, Honghua
    MANUFACTURING SCIENCE AND TECHNOLOGY, PTS 1-3, 2011, 295-297 : 1230 - +
  • [24] IMPORTANCE OF CABLE VIBRATION IN DYNAMICS OF CABLE-STAYED BRIDGES
    ABDELGHAFFAR, AM
    KHALIFA, MA
    JOURNAL OF ENGINEERING MECHANICS-ASCE, 1991, 117 (11): : 2571 - 2589
  • [25] EFFECT OF CABLE STIFFNESS ON CABLE-STAYED BRIDGES.
    Krishna, P.
    Arya, A.S.
    Agrawal, T.P.
    Journal of structural engineering New York, N.Y., 1985, 111 (09): : 2008 - 2020
  • [26] Characteristics of cable deformation on cable-stayed and suspension bridges
    Leu, YC
    Wang, YC
    ADVANCES IN COMPUTATIONAL TECHNIQUES FOR STRUCTURAL ENGINEERING, 1996, : 91 - 98
  • [27] Influence of Fatigue on Cable Arrangement in Cable-stayed Bridges
    Pipinato, A.
    Pellegrino, C.
    Fregno, G.
    Modena, C.
    INTERNATIONAL JOURNAL OF STEEL STRUCTURES, 2012, 12 (01) : 107 - 123
  • [28] EFFECT OF CABLE STIFFNESS ON CABLE-STAYED BRIDGES - CLOSURE
    KRISHNA, P
    ARYA, AS
    AGRAWAL, TP
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1987, 113 (11): : 2310 - 2310
  • [29] Modeling of cable vibration effects of cable-stayed bridges
    Cheng S.H.
    Lau D.T.
    Earthquake Engineering and Engineering Vibration, 2002, 1 (01) : 74 - 85
  • [30] Modeling of cable vibration effects of cable-stayed bridges
    S.H.Cheng
    David T.Lau
    Earthquake Engineering and Engineering Vibration, 2002, 1 (01) : 74 - 85