Development of cable maintenance robot for cable-stayed bridges

被引:28
|
作者
Luo, Yun [1 ]
Xie, Shaorong
Gong, Zhenbang
Lu, Tiansheng
机构
[1] Shanghai Univ, Coll Mechatron Engn & Automat, Shanghai, Peoples R China
[2] Shanghai Jiao Tong Univ, Coll Mech Engn, Shanghai 200030, Peoples R China
关键词
robotics; cable bridges; China;
D O I
10.1108/01439910710749627
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - In order to replace the conventional human maintenance of cable-stayed bridges, a robot is designed and constructed for tasks such as cleaning, painting and rust-detecting. Design/methodology/approach - Adopting a modular approach, two kinds of climbing mechanisms, plus a painting mechanism and a rust-detecting method are designed. Findings - A robot that can climb and maintain the cables of cable-stayed bridges has been designed and constructed. It has been proved by experiment that the robot can overcome many disadvantages of conventional human bridge-maintenance, and drastically improve efficiency, cost, and safety. Research limitations/implications - The robot is of industrial size, but a new mechanism requiring less installing time will be designed for the future. Practical implications - The robot has been applied to cables of the Nanpu Bridge and Xupu Bridge in Shanghai. More than 80 cable-stayed bridges and six suspension bridges have been built or are being constructed across large rivers in China alone. This gives an enormous potential market. Originality/value - The cable maintenance robot developed in this paper is the world's first special robot for the cables of cable-stayed bridges.
引用
收藏
页码:303 / 309
页数:7
相关论文
共 50 条
  • [11] Influence of cable dampers on cable-stayed bridges
    Liang, Dong
    Kong, Dandan
    Li, Yanfeng
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2014, 167 (04) : 293 - 302
  • [12] Optimization of cable preloading on cable-stayed bridges
    Wang, YC
    Vlahinos, AS
    Shu, HS
    SMART SYSTEMS FOR BRIDGES, STRUCTURES, AND HIGHWAYS - SMART STRUCTURES AND MATERIALS 1997, 1997, 3043 : 248 - 259
  • [13] Cable-Stayed Bridges.
    Ciolina, F.
    Travaux, 1975, (478): : 60 - 63
  • [14] CABLE-STAYED BRIDGES.
    Chalisgaonkar, Rajendra
    Indian Concrete Journal, 1986, 60 (07): : 182 - 186
  • [15] CABLE-STAYED BRIDGES.
    Podolny Jr., Walter
    Engineering Journal, 1974, 11 (1 First Q): : 1 - 11
  • [16] CONSTRUCTIBILITY OF CABLE-STAYED BRIDGES
    ROWINGS, JE
    KASPAR, SL
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (02): : 259 - 278
  • [17] Aesthetics of cable-stayed bridges
    Tang, MC
    FIFTH INTERNATIONAL BRIDGE ENGINEERING CONFERENCE, VOLS 1 AND 2: BRIDGES, OTHER STRUCTURES, AND HYDRAULICS AND HYDROLOGY, 2000, 1696 : A34 - A43
  • [18] CABLE-STAYED BRIDGES IN CRISIS
    WILSON, F
    ARCHITECTURE-THE AIA JOURNAL, 1988, 77 (12): : 111 - 114
  • [19] COMPUTING FOR CABLE-STAYED BRIDGES
    不详
    CIVIL ENGINEERING, 1995, 65 (08): : 14 - 18
  • [20] EFFECT OF CABLE STIFFNESS ON CABLE-STAYED BRIDGES - DISCUSSION
    HEGAB, HIA
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1987, 113 (11): : 2309 - 2309