Prediction of SCPin Gas Wells Based on Gas Channeling-Path Characterization

被引:0
作者
Zhao, Xiaofeng [1 ]
Guan, Zhichuan [1 ]
Wu, Yanxian [2 ]
Cao, Fei [3 ]
机构
[1] China Univ Petr East China, Coll Petr Engn, Qingdao 266580, Shandong, Peoples R China
[2] Petrochina Xinjiang Oilfield Co, Gas Prod Plant 1, Karamay 834000, Xinjiang, Peoples R China
[3] Univ Texas Austin, Dept Petr & Geosyst Engn, Austin, TX 78712 USA
来源
JOURNAL OF ENGINEERING RESEARCH | 2017年 / 5卷 / 02期
关键词
Annular equivalent permeability; gas channeling; gas well; prediction; sustained casing pressure; ANNULAR-PRESSURE BUILDUP;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Sustained Casing Pressure (SCP) is a critical aspect to. gas well safety and environmental protection. All regulations require SCP elimination. This paper focuses on the SCP which is caused by gas migration in cemented casing annulus. We modeled the gas channeling-path of cemented section and further developed a modified method to predict casing pressure rise. A field study was presented in the paper to verify the result of the prediction. We also analyzed the effects of the annular permeability, initial annular pressure, gas leakage pressure and the cementing isolation interval length on SCP. The annular equivalent permeability and initial annular pressure influence the rising rate of casing pressure without influencing the maximum casing pressure; while gas leakage pressure and the length of cementing isolation interval can influence both the rising rate and the maximum casing pressure. We discussed also the prevention measures. In particular, we suggest that the rising rate and the maximum of casing pressure should be considered while determining the cementing isolation interval.
引用
收藏
页码:223 / 235
页数:13
相关论文
共 22 条
  • [1] American Petroleum Institute (API), 2006, 90 API RP, Vfirst
  • [2] Application of vacuum-insulated tubing to mitigate annular pressure buildup
    Azzola, J. H.
    Tselepidakis, D. P.
    Pattillo, P. D.
    Richey, J. F.
    Tinker, S. J.
    Miller, R. A.
    Segreto, S. J.
    [J]. SPE DRILLING & COMPLETION, 2007, 22 (01) : 46 - 51
  • [3] Bellarby J., 2013, 2013 SPEIADC DRILL C
  • [4] Bourgoyne A. T., 1999, OFFSH TECH C 3 6 MAY
  • [5] Che Zhengan, 2010, Natural Gas Industry, V30, P88, DOI 10.3787/j.issn.1000-0976.2010.02.023
  • [6] Gu Xiaohong, 2013, FAULT BLOCK OIL GAS, V20, P663
  • [7] Sustaining Production by Managing Annular-Pressure Buildup
    Hasan, A. R.
    Izgec, B.
    Kabir, C. S.
    [J]. SPE PRODUCTION & OPERATIONS, 2010, 25 (02): : 195 - 203
  • [8] Huerta N.J., 2009, P SPE INT C CO 2 CAP
  • [9] Kinik K., 2011, SPE AM E P HLTH SAF
  • [10] Li Lili, 2013, Natural Gas Industry, V33, P101, DOI 10.3787/j.issn.1000-0976.2013.01.017