Efficient algorithms to minimize makespan of the unrelated parallel batch-processing machines scheduling problem with unequal job ready times

被引:9
|
作者
Zarook, Yaser [1 ]
Rezaeian, Javad [1 ]
Mahdavi, Iraj [1 ]
Yaghini, Masoud [2 ]
机构
[1] Mazandaran Univ Sci & Technol Babol, Dept Ind Engn, Mazandaran, Iran
[2] Iran Univ Sci & Technol, Dept Rail Transportat Engn, Sch Railway Engn, Tehran, Iran
关键词
Unrelated parallel machines; batch-processing; heuristic; dynamic job ready times; Makespan; mathematical modeling; SIZES; FAMILIES;
D O I
10.1051/ro/2021062
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper considers the minimization of makespan in the unrelated parallel batch processing machines scheduling problem with considering non-identical job size and dynamic job ready time. The considered unrelated machines have different capacity and different processing speed. Each machine processes a number of the jobs as a batch at the same time so that the machine's capacity is not exceeded. The batch processing time and the batch ready time are equal to the largest processing time and the largest ready time of jobs in the same batch, respectively. In this paper, a Mixed Integer Linear Programming (MILP) model, two categories of the heuristic procedures (six heuristics) and a meta-heuristic algorithm are proposed to solve the problem. A lower bound is also presented by relaxing of the original problem to evaluate the quality of the proposed algorithms. The computational experiments show the performance of the proposed algorithms under the considered measures.
引用
收藏
页码:1501 / 1522
页数:22
相关论文
共 50 条
  • [1] A simulated annealing algorithm to minimize makespan of parallel batch processing machines with unequal job ready times
    Damodaran, Purushothaman
    Velez-Gallego, Mario C.
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (01) : 1451 - 1458
  • [2] Heuristics for makespan minimization on parallel batch processing machines with unequal job ready times
    Damodaran, Purushothaman
    Velez-Gallego, Mario C.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (9-12): : 1119 - 1128
  • [3] Heuristics for makespan minimization on parallel batch processing machines with unequal job ready times
    Purushothaman Damodaran
    Mario C. Velez-Gallego
    The International Journal of Advanced Manufacturing Technology, 2010, 49 : 1119 - 1128
  • [4] Scheduling unrelated parallel batch processing machines with non-identical job sizes and unequal ready times
    Arroyo, Jose Elias C.
    Leung, Joseph Y. -T.
    COMPUTERS & OPERATIONS RESEARCH, 2017, 78 : 117 - 128
  • [5] Meta-heuristic algorithms for scheduling on parallel batch machines with unequal job ready times
    Fidelis, Michele B.
    Arroyo, Jose Elias C.
    2017 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2017, : 542 - 547
  • [6] Minimizing the makespan for different volume parallel batch-processing machines problem with release times and job sizes
    Wang, Hui-Mei
    Chou, Fuh-Der
    Huang, Chun-Ying
    ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 1509 - 1514
  • [7] Scheduling a capacitated batch-processing machine to minimize makespan
    Damodaran, Purushothaman
    Srihari, Krishnaswami
    Lam, Sarah S.
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2007, 23 (02) : 208 - 216
  • [8] Minimizing makespan for mixed batch scheduling with identical machines and unequal ready times
    Huang, Jindian
    SCIENTIFIC REPORTS, 2025, 15 (01):
  • [9] An Efficient Algorithmto Minimize Makespan on Parallel Batch Processing Machines
    Chakravorty, Arindam
    Saha, Shirshasis
    Laha, Dipak
    Das, Abhirup
    2020 4TH INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND NETWORKS (CINE 2020), 2020,
  • [10] Exact algorithms to minimize makespan on single and parallel batch processing machines
    Muter, Ibrahim
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 285 (02) : 470 - 483