Dow AgroSciences uses simulation-based optimization to schedule the new-product development process

被引:8
作者
Bassett, MH
Gardner, LL
Steele, K
机构
[1] Dow AgroSci, Indianapolis, IN 46268 USA
[2] Univ Indianapolis, Indianapolis, IN 46227 USA
关键词
information systems; decision-support systems; industries; chemical;
D O I
10.1287/inte.1040.0099
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Dow AgroSciences has improved its bottom line by using simulation-based optimization to reduce the time and expense of moving a portfolio of products to market. We examined mathematical programming approaches for scheduling new-product development but found that the solution of these formulations is intractable for problems of practical size that include resource constraints. We developed a simulation-based framework for generating feasible solutions, which can be used with any heuristic optimization approach (for example, tabu search or genetic algorithms). The heuristic optimization algorithms operate on a solution space consisting of the precedence relationships among activities in the new-product development process. The firm implemented this approach via a Six Sigma project. From 1998 to 2004, it saved several million dollars based on the schedules determined using simulation-based heuristic optimization.
引用
收藏
页码:426 / 437
页数:12
相关论文
共 16 条
  • [1] A two-stage methodology for short-term batch plant scheduling: discrete-event simulation and genetic algorithm
    Azzaro-Pantel, C
    Bernal-Haro, L
    Baudet, P
    Domenech, S
    Pibouleau, L
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 1998, 22 (10) : 1461 - 1481
  • [2] Bailetti AJ, 1998, R&D MANAGE, V28, P237, DOI 10.1111/1467-9310.00101
  • [3] BRIGGER P, 1995, OPTIMIZATION STRUCTU
  • [4] Aligning and prioritizing corporate R&D
    Comstock, GL
    Sjolseth, DE
    [J]. RESEARCH-TECHNOLOGY MANAGEMENT, 1999, 42 (03) : 19 - 25
  • [5] Cooper R.G., 1993, WINNING NEW PRODUCTS
  • [6] TABU SEARCH - A TUTORIAL
    GLOVER, F
    [J]. INTERFACES, 1990, 20 (04) : 74 - 94
  • [7] Honkomp SJ, 1997, COMPUT CHEM ENG, V21, pS1055
  • [8] HONKOMP SJ, 1997, SESS 10C02 1997 AM I
  • [9] Resource-constrained scheduling of tests in new product development
    Jain, V
    Grossmann, IE
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1999, 38 (08) : 3013 - 3026
  • [10] Langley JL, 1999, INT REV AFR AM ART, V16, P2