Dow AgroSciences uses simulation-based optimization to schedule the new-product development process

被引:8
作者
Bassett, MH
Gardner, LL
Steele, K
机构
[1] Dow AgroSci, Indianapolis, IN 46268 USA
[2] Univ Indianapolis, Indianapolis, IN 46227 USA
关键词
information systems; decision-support systems; industries; chemical;
D O I
10.1287/inte.1040.0099
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Dow AgroSciences has improved its bottom line by using simulation-based optimization to reduce the time and expense of moving a portfolio of products to market. We examined mathematical programming approaches for scheduling new-product development but found that the solution of these formulations is intractable for problems of practical size that include resource constraints. We developed a simulation-based framework for generating feasible solutions, which can be used with any heuristic optimization approach (for example, tabu search or genetic algorithms). The heuristic optimization algorithms operate on a solution space consisting of the precedence relationships among activities in the new-product development process. The firm implemented this approach via a Six Sigma project. From 1998 to 2004, it saved several million dollars based on the schedules determined using simulation-based heuristic optimization.
引用
收藏
页码:426 / 437
页数:12
相关论文
共 16 条
[1]   A two-stage methodology for short-term batch plant scheduling: discrete-event simulation and genetic algorithm [J].
Azzaro-Pantel, C ;
Bernal-Haro, L ;
Baudet, P ;
Domenech, S ;
Pibouleau, L .
COMPUTERS & CHEMICAL ENGINEERING, 1998, 22 (10) :1461-1481
[2]  
Bailetti AJ, 1998, R&D MANAGE, V28, P237, DOI 10.1111/1467-9310.00101
[3]  
BRIGGER P, 1995, OPTIMIZATION STRUCTU
[4]   Aligning and prioritizing corporate R&D [J].
Comstock, GL ;
Sjolseth, DE .
RESEARCH-TECHNOLOGY MANAGEMENT, 1999, 42 (03) :19-25
[5]  
Cooper R.G., 1993, WINNING NEW PRODUCTS
[6]   TABU SEARCH - A TUTORIAL [J].
GLOVER, F .
INTERFACES, 1990, 20 (04) :74-94
[7]  
Honkomp SJ, 1997, COMPUT CHEM ENG, V21, pS1055
[8]  
HONKOMP SJ, 1997, SESS 10C02 1997 AM I
[9]   Resource-constrained scheduling of tests in new product development [J].
Jain, V ;
Grossmann, IE .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1999, 38 (08) :3013-3026
[10]  
Langley JL, 1999, INT REV AFR AM ART, V16, P2