The mixed production mode considering continuous and intermittent processing for an energy-efficient hybrid flow shop scheduling

被引:53
作者
Liu, Zhifeng [1 ,2 ]
Yan, Jun [1 ,2 ]
Cheng, Qiang [1 ,2 ]
Yang, Congbin [1 ,2 ]
Sun, Shuwen [1 ,2 ]
Xue, Deyi [3 ]
机构
[1] Beijing Univ Technol, Inst Adv Mfg & Intelligent Technol, Beijing 100124, Peoples R China
[2] Beijing Univ Technol, Beijing Key Lab Adv Mfg Technol, Beijing 100124, Peoples R China
[3] Univ Calgary, Dept Mech & Mfg Engn, Calgary, AB T2N 1N4, Canada
基金
中国国家自然科学基金;
关键词
Energy efficiency; Production mode; Hybrid flow shop scheduling; Forging operation; Multiple time factors; DEPENDENT SETUP TIMES; CONSUMPTION; STEEL; MICROSTRUCTURE; OPTIMIZATION; TARDINESS; ALGORITHM;
D O I
10.1016/j.jclepro.2019.119071
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Energy-saving scheduling in forging production has attracted increasing attention because of the advances in sustainable manufacturing technologies. The unit energy consumption of forging production equipment is significantly higher than that of other general manufacturing equipment. Employing efficient and energy-saving scheduling methods can significantly reduce the energy consumption in forging production. However, the relationship between heating furnace and other equipment in forging production is complicated, resulting in few studies on energy-saving scheduling problem for forging production line. Thus, the energy-efficient hybrid flow shop scheduling problem with forging operations (EHFSP-FO) was investigated in this research. First, the production mode considering multiple time factors and mixed production was established. The mixed production mode consisted of continuous processing with variable parameters and intermittent processing. Then, a novel mathematical model considering makespan and energy consumption was constructed based on the mixed production mode for the proposed problem, and a new rule to identify the optimum transportation sequence and time was formulated. Furthermore, the population and major operators were designed and applied to an evolutionary algorithm by weighted sum approach. The scheduling results were achieved based on the real-world process data for different types of ring forgings to verify the feasibility of the established mathematical model. The experimental results demonstrated that the proposed mathematical model can be used to identify the optimal schedule considering makespan and energy consumption simultaneously. (C) 2019 Elsevier Ltd. All rights reserved.
引用
收藏
页数:17
相关论文
共 32 条
[1]   The third comprehensive survey on scheduling problems with setup times/costs [J].
Allahverdi, Ali .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (02) :345-378
[2]   Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops [J].
Bruzzone, A. A. G. ;
Anghinolfi, D. ;
Paolucci, M. ;
Tonelli, F. .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2012, 61 (01) :459-462
[3]   Machining accuracy reliability analysis of multi-axis machine tool based on Monte Carlo simulation [J].
Cheng, Qiang ;
Zhao, Hongwei ;
Zhao, Yongsheng ;
Sun, Bingwei ;
Gu, Peihua .
JOURNAL OF INTELLIGENT MANUFACTURING, 2018, 29 (01) :191-209
[4]   Hot forging process design of sprocket wheel and environmental effect analysis [J].
Choi, Yong-Jin ;
Lee, Sang-Kon ;
Lee, In-Kyu ;
Hwang, Sun Kwang ;
Yoon, Jong Cheon ;
Choi, Chang Young ;
Lee, Yoon Sun ;
Jeong, Myeong-Sik .
JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY, 2018, 32 (05) :2219-2225
[5]   Influence of Solution Treatment Duration on Microstructural Features of an Industrial Forged UNS S32750/1.4410/F53 Super Duplex Stainless Steel (SDSS) Alloy [J].
Cojocaru, Vasile Danut ;
Raducanu, Doina ;
Angelescu, Mariana Lucia ;
Vintila, Adrian Nicolae ;
Serban, Nicolae ;
Dan, Ioan ;
Cojocaru, Elisabeta Mirela ;
Cinca, Ion .
JOM, 2017, 69 (08) :1439-1445
[6]   Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithm [J].
Dai, Min ;
Tang, Dunbing ;
Giret, Adriana ;
Salido, Miguel A. ;
Li, W. D. .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2013, 29 (05) :418-429
[7]   Research on Energy Saving Dispatching of Forging Link Based on Number of Reheating Times [J].
He, Fei ;
Ma, Xiaomei ;
Jiang, Mingming .
2ND INTERNATIONAL CONFERENCE ON FRONTIERS OF MATERIALS SYNTHESIS AND PROCESSING, 2019, 493
[8]   Research on Energy-Saving Scheduling of a Forging Stock Charging Furnace Based on an Improved SPEA2 Algorithm [J].
He, Fei ;
Shen, Kang ;
Guan, Li ;
Jiang, Mingming .
SUSTAINABILITY, 2017, 9 (11)
[9]   Two-stage multiprocessor flow shop scheduling with deteriorating maintenance in cleaner production [J].
Huang, Rong-Hwa ;
Yu, Shun-Chi .
JOURNAL OF CLEANER PRODUCTION, 2016, 135 :276-283
[10]   Microstructure evolution, fracture and hardening mechanisms of quenched and tempered steel for large sized bearing rings at elevated quenching temperatures [J].
Jiang, Bo ;
Mei, Zhen ;
Zhou, Leyu ;
Zhang, Chaolei ;
Liu, Yazheng .
METALS AND MATERIALS INTERNATIONAL, 2016, 22 (04) :572-578