Disruptions management of a supply chain under strategic subsidy policy for the demand-stimulating inventory

被引:13
作者
Chen, Kebing [1 ]
Shen, Jiulong [1 ]
Feng, Meiling [1 ]
机构
[1] Nanjing Univ Aeronaut & Astronaut, Dept Math, Nanjing 210016, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Supply chain management; Coordination; Disruptions; Subsidy contract; Win-win; CONTROLLABLE LEAD TIME; ONE-MANUFACTURER; COORDINATION; COST; INTEGRATION; CONTRACTS; MODELS;
D O I
10.1016/j.cie.2014.07.030
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper introduces a game model of one manufacturer and one retailer with the demand depending on the amount of inventory displayed on the retailer's shelf. We study coordination mechanisms of the supply chain with the two kinds of disruptions. To coordinate the channel as well as make a profit, the manufacturer needs to augment the wholesale price lever by another, i.e., an inventory-holding cost subsidy to the retailer. We show that the inventory-subsidy contract for disruption(s) situation has its rationality and limitation: from the perspective of feasibility analysis, we find that when the disrupted amount of inventory-holding cost is larger than a certain threshold value, both players can achieve win-win by using inventory-subsidy contract. Otherwise, it may be ineffective. For two-factor disruptions, there are some mutual restraints between the disrupted inventory-holding cost and the disrupted demand when the coordination mechanism is used. We also find that both disruption situations have their own robust scales, in which the manufacturer should not change the original production plan but at the expense of providing a more attractive subsidy scheme to the retailer. Interestingly, some counter-intuitive managerial insights can be observed in robust scales. For example, the market demand increases with the displayed inventory level in the setting of the demand-stimulating inventory. However, the higher the demand, the less displayed inventory level will be in the robust scale. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:169 / 182
页数:14
相关论文
共 46 条
[1]  
[Anonymous], 1985, Decision Systems for Inventory Management and Production Planning
[2]   Coordinating orders in a two echelon supply chain with controllable lead time and ordering cost using the credit period [J].
Arkan, Ali ;
Hejazi, Seyed Reza .
COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 62 (01) :56-69
[3]   Disruption management for commercial airlines: methods and results for the ROADEF 2009 Challenge [J].
Artigues, Christian ;
Bourreau, Eric ;
Afsar, H. Murat ;
Briant, Olivier ;
Boudia, Mourad .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2012, 6 (06) :669-689
[4]   Stack them high, let 'em fly: Lot-sizing policies when inventories stimulate demand [J].
Balakrishnan, A ;
Pangburn, MS ;
Stavrulaki, E .
MANAGEMENT SCIENCE, 2004, 50 (05) :630-644
[5]  
Cachon G., 1999, COMPETITIVE COOPERAT
[6]  
Cachon G.P., 2004, HDB OPERATIONS RES M
[7]   Supply chain coordination with revenue-sharing contracts: Strengths and limitations [J].
Cachon, GP ;
Lariviere, MA .
MANAGEMENT SCIENCE, 2005, 51 (01) :30-44
[8]  
Celikbas M, 1999, IIE TRANS, V31, P851, DOI 10.1023/A:1007622632424
[9]   Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction [J].
Chang, HC ;
Ouyang, LY ;
Wu, KS ;
Ho, CH .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 170 (02) :481-495
[10]   Coordination mechanism for the supply chain with leadtime consideration and price-dependent demand [J].
Chen, Haoya ;
Chen, Youhua ;
Chiu, Chun-Hung ;
Choi, Tsan-Ming ;
Sethi, Suresh .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 203 (01) :70-80