The MEOW lunar project for education and science based on concurrent engineering approach

被引:10
作者
Roibas-Millan, E. [1 ]
Sorribes-Palmer, F. [1 ]
Chimeno-Manguan, M. [2 ]
机构
[1] Univ Politecn Madrid, Micrograv Inst IDR UPM, E-28040 Madrid, Spain
[2] Univ Politecn Madrid, ETSIAE, E-28040 Madrid, Spain
关键词
Lunar mission; WSB transfer; Concurrent engineering; CDF; DESIGN; MISSION; SYSTEMS; MOON;
D O I
10.1016/j.actaastro.2018.04.047
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
The use of concurrent engineering in the design of space missions allows to take into account in an interrelated methodology the high level of coupling and iteration of mission subsystems in the preliminary conceptual phase. This work presents the result of applying concurrent engineering in a short time lapse to design the main elements of the preliminary design for a lunar exploration mission, developed within ESA Academy Concurrent Engineering Challenge 2017. During this program, students of the Master in Space Systems at Technical University of Madrid designed a low cost satellite to find water on the Moon south pole as prospect of a future human lunar base. The resulting mission, The Moon Explorer And Observer of Water/Ice (MEOW) compromises a 262 kg spacecraft to be launched into a Geostationary Transfer Orbit as a secondary payload in the 2023/2025 time frame. A three months Weak Stability Boundary transfer via the Sun-Earth Ll Lagrange point allows for a high launch timeframe flexibility. The different aspects of the mission (orbit analysis, spacecraft design and payload) and possibilities of concurrent engineering are described.
引用
收藏
页码:111 / 120
页数:10
相关论文
共 28 条
[1]  
[Anonymous], ECSSEST1002C EUR SPA
[2]  
Arianespace, 2000, USERS MANUAL
[3]   An application of the Design Structure Matrix to Integrated Concurrent Engineering [J].
Avnet, Mark S. ;
Weigel, Annalisa L. .
ACTA ASTRONAUTICA, 2010, 66 (5-6) :937-949
[4]  
Bandecchi M., CONCURRENT ENG APPL
[5]  
Biesbroek R, 2000, ESA BULL-EUR SPACE, P92
[6]  
Budianto I., 2000, 2000 IEEE AER C BIG, P1
[7]   The Zeus Mission Study - An application of automated collaborative design [J].
Doyotte, R ;
Love, SG ;
Peterson, CE .
ACTA ASTRONAUTICA, 1999, 45 (4-9) :441-448
[8]  
Eckart P., 1996, SSC98VI3 SURV SAT TE
[9]  
European Space Agency, 2012, MARG PHIL SCI ASS ST
[10]  
European Space Agency, 2011, ECSSTM1025 EUR SPAC