Factors affecting the efficiency of repair to propped and unpropped bridge beams

被引:5
作者
Mangat, PS [1 ]
O'Flaherty, FJ [1 ]
机构
[1] Sheffield Hallam Univ, Sch Environm & Dev, Sheffield S1 1WB, S Yorkshire, England
关键词
D O I
10.1680/macr.2000.52.4.303
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents the results of laboratory and field investigations of bridge beams repaired both under propped and unpropped conditions. In the laboratory beams were repaired using hand-applied repairs. Repairs to beams in two highway, bridges were carried out using both hand-applied and flowing repairs. The repair materials used were commercial products of wide-ranging properties (shrinkage, creep and elastic modulus). Both low stiffness repair materials of elastic modulus, E-rm, less than the substrate E-sub, and high stiffness repair materials (E-rm > E-sub) were used. The repairs were applied in the tensile zone of the beams. Strain distributions in the different phases of repair patches were monitored under service loading for a period of up to 240 weeks. The results show that high structural efficiency is achieved with repairs having E-rm > E-sub, other properties (shrinkage and creep) being within reasonable limits. Such repairs ave less plane to restrained shrinkage cracking and show a capacity for load redistribution into the repair patch. Low stiffness repairs (E-rm < E-sub), on the other hand, are prone to restrained shrinkage cracking and are ineffective in load-sharing with the substrate. Repairs to propped flexural members developed erratic and non-uniform load distribution in the different phases upon reapplication of load. Composite action between the repair patch and the substrate results in cracking in the repair patch, rendering the repairs structurally inefficient.
引用
收藏
页码:303 / 319
页数:17
相关论文
共 19 条
[1]  
[Anonymous], 38 CONCR SOC
[2]   Drying shrinkage stresses in concrete patch repair systems [J].
Asad, M ;
Baluch, MH ;
Al-Gadhib, AH .
MAGAZINE OF CONCRETE RESEARCH, 1997, 49 (181) :283-293
[3]   STRUCTURAL REPAIR OF REINFORCED-CONCRETE PORTAL FRAME [J].
BLIGHT, GE ;
ALEXANDER, MG ;
LAMPACHER, BJ .
MAGAZINE OF CONCRETE RESEARCH, 1993, 45 (163) :97-101
[4]  
CAIRNS J, 1989, P C DET REP REINF CO
[5]  
Dector M.H., 1993, INDIAN CONCRETE OCT, P475
[6]  
*DEP TRANSP, 1986, BD286 DEP TRANSP
[7]  
*DEP TRANSP, 1989, PERF CONCR BRIDG SUR
[8]   Significance of property mismatch in the patch repair of structural concrete .3. Reinforced concrete members in flexure [J].
Emberson, NK ;
Mays, GC .
MAGAZINE OF CONCRETE RESEARCH, 1996, 48 (174) :45-57
[9]  
EMMONS PH, 1995, CONCRETE INT MAR, P31
[10]  
EMMONS PH, REMRCS470 US ARM COR