Comparison of occupational exposure according to dismantling strategy of Kori nuclear power plant unit #1 bio-shield

被引:6
|
作者
Lee, ChoongWie [1 ]
Kim, Hee Reyoung [1 ]
Lee, Seung Jun [1 ]
机构
[1] Ulsan Natl Inst Sci & Technol, Ulsan 44919, South Korea
关键词
Occupational exposure; Dismantling; Dose assessment; ALARA principle; Bio-shield;
D O I
10.1016/j.anucene.2021.108227
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
In this study, to evaluate the occupational exposure during dismantling of the bio-shield of the Kori nuclear power plant unit #1, the strategy and process of dismantling the concrete of the bio-shield were analyzed. Two strategies (cutting activated concrete prior to non-activated concrete and vice-versa) were analyzed with a focus on the cutting process, which differs significantly depending on the dismantling strategy, and additional costs related to the cutting equipment and disposal process were calculated accordingly. VISIPLAN was used to evaluate occupational exposure during cutting, and the exposure dose was assessed using the ALARA principle. The strategy where activated concrete was cut prior to nonactivated concrete was evaluated to be 47% more inexpensive than the other strategy while satisfying the annual dose limit for workers in economic terms. (C) 2021 Elsevier Ltd. All rights reserved.
引用
收藏
页数:6
相关论文
共 10 条
  • [1] Occupational internal exposure calculation during dismantling of bio-shield of Kori nuclear power plant unit#1
    Lee, ChoongWie
    Lee, Donghyun
    Kim, Hee Reyoung
    Lee, Seung Jun
    PROGRESS IN NUCLEAR ENERGY, 2020, 126 (126)
  • [2] External dose assessment for workers dismantling the bio-shield of a commercial power nuclear reactor: Case study of Kori-1, Korea
    Lee, ChoongWie
    Lee, Donghyun
    Kim, Hee Reyoung
    Lee, Seung Jun
    NUCLEAR ENGINEERING AND TECHNOLOGY, 2020, 52 (09) : 2085 - 2091
  • [3] A Study on the Construction of Cutting Scenario for Kori Unit 1 Bio-shield considering ALARA
    Lee, Hak-Yun
    Lee, Min -Ho
    Yang, Ki-Tae
    An, Jun-Yeol
    Song, Jong-Soon
    NUCLEAR ENGINEERING AND TECHNOLOGY, 2023, 55 (11) : 4181 - 4190
  • [4] Analysis of the radioactivity in bio-shield of Kori NPP unit 1 via computational simulation
    Lee, Hyeonmin
    Lee, Jaeho
    Choi, Woo Nyun
    Yoon, Seungbin
    Kim, Hee Reyoung
    PROGRESS IN NUCLEAR ENERGY, 2024, 169
  • [5] A Study on the Evaluation of Surface Dose Rate of New Disposal Containers Though the Activation Evaluation of Bio-Shield Concrete Waste From Kori Unit 1
    Kang, Gi-Woong
    Kim, Rin-Ah
    Do, Ho-Seok
    Kim, Tae-Man
    Cho, Chun-Hyung
    JOURNAL OF NUCLEAR FUEL CYCLE AND WASTE TECHNOLOGY, 2021, 19 (01): : 133 - 140
  • [6] ESTABLISHMENT OF A SEVERE ACCIDENT MITIGATION STRATEGY FOR AN SBO AT WOLSONG UNIT 1 NUCLEAR POWER PLANT
    Kim, Sungmin
    Kim, Dongha
    NUCLEAR ENGINEERING AND TECHNOLOGY, 2013, 45 (04) : 459 - 468
  • [7] Assessment of environmental public exposure from a hypothetical nuclear accident for Unit-1 Bushehr nuclear power plant
    Sohrabi, M.
    Ghasemi, M.
    Amrollahi, R.
    Khamooshi, C.
    Parsouzi, Z.
    RADIATION AND ENVIRONMENTAL BIOPHYSICS, 2013, 52 (02) : 235 - 244
  • [8] Assessment of environmental public exposure from a hypothetical nuclear accident for Unit-1 Bushehr nuclear power plant
    M. Sohrabi
    M. Ghasemi
    R. Amrollahi
    C. Khamooshi
    Z. Parsouzi
    Radiation and Environmental Biophysics, 2013, 52 : 235 - 244
  • [9] Analysis of main-steam-line-break accidents using RETRAN-3D for pressurized thermal shock evaluation of the Kori Nuclear Unit-1 power plant
    Kim, JH
    Hong, SJ
    Park, GC
    Kim, YS
    NUCLEAR TECHNOLOGY, 2000, 132 (02) : 227 - 239
  • [10] Public exposure from environmental release of radioactive material under normal operation of unit-1 Bushehr nuclear power plant
    Sohrabi, M.
    Parsouzi, Z.
    Amrollahi, R.
    Khamooshy, C.
    Ghasemi, M.
    ANNALS OF NUCLEAR ENERGY, 2013, 55 : 351 - 358