Assessment of Critical Construction Engineering and Management Aspects of Nuclear Power Projects

被引:12
|
作者
Wright, Erik R. [1 ]
Cho, Kyuman [2 ]
Hastak, Makarand [3 ]
机构
[1] US Mil Acad, Dept Civil & Mech Engn, West Point, NY 10996 USA
[2] Chosun Univ, Sch Architecture, Kwangju 501759, South Korea
[3] Purdue Univ, Div Construct Engn & Management, W Lafayette, IN 47907 USA
关键词
Nuclear power construction; Exploratory factor analysis;
D O I
10.1061/(ASCE)ME.1943-5479.0000286
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Thirty years ago when the last nuclear power plant was ordered in the United States, many nuclear projects were suffering from large cost and schedule overruns, which were often caused by poor project management practices and a general lack of nuclear experience. This research aims at illustrating (1) critical project management areas and tasks with respect to a nuclear project life cycle; and (2) critical aspects associated with the successful nuclear construction projects. As a result, this research identified the relative priorities of six phases of a modified engineering procurement construction (EPC) project life cycle with respect to nuclear construction projects based on the results of descriptive statistics. Subsequently, 76 tasks embedded in the modified life cycle were condensed into 12 critical aspects of nuclear construction projects using an exploratory factor analysis method. Consequently, this research is aimed at establishing the basis for the development of a modern nuclear construction body of knowledge and the education of the future experienced cadre of nuclear construction professionals. (C) 2014 American Society of Civil Engineers.