Decision support method for estimating monetary value of post-renovation office buildings

被引:8
作者
Cho, Kyuman [1 ]
Kim, Jungwoo [2 ]
Kim, Taehoon [1 ]
机构
[1] Chosun Univ, Sch Architecture, Gwangju, South Korea
[2] Chosun Univ, Dept Architectural Engn, Gwangju, South Korea
关键词
case-based reasoning; office property monetary value; prediction model; project owner; renovation work; DETERMINING ATTRIBUTE WEIGHTS; COST PREDICTION; NEURAL-NETWORKS; CBR MODEL; INDEXES;
D O I
10.1139/cjce-2017-0692
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction industry engages in renovation work to improve the physical, economic, and environmental aspects of office buildings. During consideration of renovation of deteriorated office buildings, it is critical for project owners to estimate the change in monetary value of the office buildings due to the completed renovation work. Nevertheless, related research and methods for predicting this value remain insufficient. In this study, the monetary value prediction model for post-renovation office buildings was developed by using artificial intelligence techniques and multivariate data analysis techniques based on 90 actual cases of renovated office buildings. The model application results showed (i) relatively high prediction performance (average error rate of 14.12%) and (ii) advantages in various aspects compared to existing approaches. It is expected that project owners considering office building renovations can be supported in decision-making by the developed proposed model. Furthermore, this research will contribute to promoting the office building renovation market.
引用
收藏
页码:1103 / 1113
页数:11
相关论文
共 35 条
[1]  
AAMODT A, 1994, AI COMMUN, V7, P39
[2]   The attribute impact concept: Applications in case-based reasoning and parametric cost estimation [J].
Ahn, Joseph ;
Ji, Sae-Hyun ;
Park, Moonseo ;
Lee, Hyun-Soo ;
Kim, Sooyoung ;
Suh, Sang-Wook .
AUTOMATION IN CONSTRUCTION, 2014, 43 :195-203
[3]   A case-based reasoning cost estimating model using experience by analytic hierarchy process [J].
An, Sung-Hoon ;
Kim, Gwang-Hee ;
Kang, Kyung-In .
BUILDING AND ENVIRONMENT, 2007, 42 (07) :2573-2579
[4]  
An SungHoon, 2005, [Journal of the Architectural Institute of Korea Structure & Construction, 대한건축학회논문집 구조계], V21, P81
[5]  
[Anonymous], 2014, INFRASTRUCTURE INVES
[6]  
[Anonymous], 2002, THESIS
[7]   Hybrid expert system using case based reasoning and neural network for classification [J].
Biswas, Saroj Kr. ;
Sinha, Nidul ;
Purakayastha, Biswajit ;
Marbaniang, Leniency .
BIOLOGICALLY INSPIRED COGNITIVE ARCHITECTURES, 2014, 9 :57-70
[8]   Neural networks for cost estimation: simulations and pilot application [J].
Bode, J .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (06) :1231-1254
[9]   Decision Support Model for Determining Cost-Effective Renovation Time [J].
Cho, Kyuman ;
Yoon, Yoojung .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (03)
[10]   Chicago's office market: Price indices, location and time [J].
Colwell, PF ;
Munneke, HJ ;
Trefzger, JW .
REAL ESTATE ECONOMICS, 1998, 26 (01) :83-106