Upgrades to PEP-II tune measurements

被引:0
作者
Fisher, AS [1 ]
Petree, M [1 ]
Wienands, U [1 ]
Allison, S [1 ]
Laznovsky, M [1 ]
Seeman, M [1 ]
Robin, J [1 ]
机构
[1] Stanford Linear Accelerator Ctr, Menlo Pk, CA 94025 USA
来源
BEAM INSTRUMENTATION WORKSHOP 2002 | 2002年 / 648卷
关键词
D O I
暂无
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
The tune monitors for the two-ring PEP-II collider convert signals from one set of four BPM-type pickup buttons per ring into horizontal and vertical differences, which are then downconverted from 95 2 MHz (twice the RF) to baseband. Two-channel 10-MHz FFT spectrum analyzers show spectra in X-window displays in the Control Room, to assist PEP operators. When operating with the original system near the beam-beam limit, collisions broadened and flattened the tune peaks, often bringing them near the noise floor, We recently installed new downconverters that increase the signal-to-noise ratio by about 5 dB. In addition, we went from one to two sets of pickups per ring, near focusing and defocusing quadrupoles, so that signals for both planes originate at locations with large amplitudes. We also have just installed a tune tracker, based on a digital lock-in amplifier (one per tune plane) that is controlled by an EPICS software feedback loop. The tracker monitors the phase of the beam's response to a sinusoidal excitation, and adjusts the drive frequency to track the middle of the 180-degree phase transition across the tune resonance. We plan next to test an outer loop controlling the tune quadrupoles based on this tune measurement.
引用
收藏
页码:267 / 274
页数:8
相关论文
共 6 条
[1]  
[Anonymous], 1993, LBLPUB5379
[2]  
Decker F. J., 2001, PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268), P3558, DOI 10.1109/PAC.2001.988177
[3]   Instrumentation and diagnostics for PEP-II [J].
Fisher, AS .
BEAM INSTRUMENTATION WORKSHOP, 1998, 451 :95-109
[4]  
*US DOE, DEAC0376SF00098 US D
[5]  
*US DOE, DEAC0376SF00515 US D
[6]  
*US DOE, W7405ENG48 US DOE