A new integrated system for selecting mining equipment

被引:6
作者
Michiotis, A
Xerocostas, D
Galitis, N
机构
[1] Natl Tech Univ Athens, Dept Mech Engn, Sector Ind Management & Operat Res, Athens, Greece
[2] Publ Power Corp, Athens, Greece
关键词
D O I
10.1016/S0360-8352(97)00164-2
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper the problem of selecting main excavating equipment in open pit lignite mines is approached through mathematical programming. The approach, which mainly refers to the preliminary scheduling of the exploitation, is based on the exploitation of an extended horizontal stratification lignite deposit and on the use of the "German equipment method". (C) 1998 Published by Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:391 / 397
页数:7
相关论文
共 7 条
[1]  
AIKEN G, 1966, MINING ENG JAN, P76
[2]  
Atkinson T, 1971, T I MIN METALL, V80, pA101
[3]  
HOFFMANN D, 1982, BRAUNKOHLE, V34, pE22
[4]  
LUBRICH W, 1988, BULK SOLIDS HANDLING, V8, P701
[5]  
MAUSE H, 1980, FOERDERN HEBEN, V30, P767
[6]  
MICHIOTIS A, 1993, THESIS NTUA ATHENS
[7]  
Wenzel J.-M., 1976, Foerdern und Heben, V26, P1103