A single machine multi-job integer batch scheduling problem with multi due date to minimize total actual flow time

被引:2
|
作者
Yusriski, Rinto [1 ]
Astuti, Budi [1 ]
Biksono, Damawijaya [2 ]
Wardani, Tika Ayu [1 ]
机构
[1] Univ Jenderal Achmad Yani, Dept Ind Engn, Bogor, Indonesia
[2] Univ Jenderal Achmad Yani, Dept Mech Engn, Bandung, Indonesia
关键词
Integer Batch Scheduling; Multi-Item; Multi Due Dates;
D O I
10.5267/j.dsl.2021.4.002
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This research deals with a multi-job Integer batch scheduling problem on a single machine with different due dates. Every job demanded one or more parts, and the single machine processed the job into a number of batches. The objective is to minimize total actual flow time, defined as the total flow time of all jobs starting from the arrival to the common due date. The decisions are Accepted April 19 2021 to determine the sequence of jobs, the number of batches, batch size, and sequence of all batches on a single machine. This research proposes three algorithms, developed based on the longest due date rule (The P1-LDD Algorithm), the adjacent pairwise interchange method (The P2-API Algorithm), and the permutation method (The P3-PM Algorithm). The numerical experience shows that the three algorithms produce an outstanding solution. The P1-LDD Algorithm fits to solve a simple problem. The P2-API Algorithm has superior to solve a big complicated problem. The P3-PM Algorithm has the best performance to solve small complicated problems. (C) 2021 by the authors; licensee Growing Science, Canada.
引用
收藏
页码:231 / 240
页数:10
相关论文
共 50 条
  • [1] Integer Batch Scheduling Problems for a Single-Machine to Minimize Total Actual Flow Time
    Yusriski, Rinto
    Astuti, Budi
    Sukoyo
    Samadhi, T. M. A. Ari
    Halim, Abdul Hakim
    2ND INTERNATIONAL MATERIALS, INDUSTRIAL, AND MANUFACTURING ENGINEERING CONFERENCE, MIMEC2015, 2015, 2 : 118 - 123
  • [2] An Integer Batch Scheduling Model for a Single Machine with Simultaneous Learning and Deterioration Effects to Minimize Total Actual Flow Time
    Yusriski, R.
    Sukoyo
    Samadhi, T. M. A. A.
    Halim, A. H.
    2ND INTERNATIONAL MANUFACTURING ENGINEERING CONFERENCE AND 3RD ASIA-PACIFIC CONFERENCE ON MANUFACTURING SYSTEMS (IMEC-APCOMS 2015), 2016, 114
  • [3] Multi-job lot streaming to minimize the weighted completion time in a hybrid flow shop scheduling problem with work shift constraint
    Mohsen Nejati
    Iraj Mahdavi
    Reza Hassanzadeh
    Nezam Mahdavi-Amiri
    MohamadSailm Mojarad
    The International Journal of Advanced Manufacturing Technology, 2014, 70 : 501 - 514
  • [4] Multi-job lot streaming to minimize the weighted completion time in a hybrid flow shop scheduling problem with work shift constraint
    Nejati, Mohsen
    Mahdavi, Iraj
    Hassanzadeh, Reza
    Mahdavi-Amiri, Nezam
    Mojarad, MohamadSailm
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 70 (1-4): : 501 - 514
  • [5] DUE-DATE ASSIGNMENT TO MULTI-JOB CUSTOMER ORDERS
    BAGCHI, U
    JULIEN, FM
    MAGAZINE, MJ
    MANAGEMENT SCIENCE, 1994, 40 (10) : 1389 - 1392
  • [6] Single machine group scheduling to minimize mean flow time subject to due date constraints
    Pan, JCH
    Wu, CC
    PRODUCTION PLANNING & CONTROL, 1998, 9 (04) : 366 - 370
  • [7] Single machine batch scheduling to minimize the sum of total flow time and batch delivery cost with an unavailability interval
    Yin, Yunqiang
    Ye, Deshi
    Zhang, Guochuan
    INFORMATION SCIENCES, 2014, 274 : 310 - 322
  • [8] Batch Scheduling for Hybrid Assembly Differentiation Flow Shop to Minimize Total Actual Flow Time
    Maulidya, R.
    Suprayogi
    Wangsaputra, R.
    Halim, A. H.
    4TH ASIA PACIFIC CONFERENCE ON MANUFACTURING SYSTEMS AND THE 3RD INTERNATIONAL MANUFACTURING ENGINEERING CONFERENCE, 2018, 319
  • [10] Robust scheduling on a single machine to minimize total flow time
    Lu, Chung-Cheng
    Lin, Shih-Wei
    Ying, Kuo-Ching
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (07) : 1682 - 1691