A linearized energy hub operation model at the presence of uncertainties: An adaptive robust solution approach

被引:18
作者
Aghamohamadi, Mehrdad [1 ]
Amjady, Nima [1 ]
Attarha, Ahmad [1 ]
机构
[1] Semnan Univ, Dept Elect Engn, Semnan, Iran
来源
INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS | 2020年 / 30卷 / 03期
关键词
adaptive robust optimization; energy hub; multi-energy system; uncertain price; load; UNIT COMMITMENT; OPTIMIZATION; WIND; STORAGE; RELIABILITY; MANAGEMENT; POWER;
D O I
10.1002/2050-7038.12193
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents a new adaptive robust operation optimization approach for energy hub (EH) to identify the optimal decisions on purchased energy carriers, upstream network interactions, and storing/conversion of the energy resources considering uncertainties. In this regard, a linearized framework for EH operation is first introduced. The proposed model is used to develop an EH including electrical energy, natural gas, and direct heat as inputs and electricity and heat demands as outputs. The electrical input energy is provided considering both purchased energy from upstream market and a photovoltaic (PV) generation, operated by the EH operator (EHO). The proposed approach characterizes the uncertain nature of loads, energy prices, and PV generations through polyhedral uncertainty sets, while the robustness of the proposed model can be controlled using the budget of uncertainty. The proposed adaptive robust model is formulated as a min-max-min optimization problem, which cannot be solved directly through an off-the-shelf optimization package. Thus, a new method, consisting decomposition + primal cutting plane + duality theory + exact linearization + post-optimization analysis, is introduced to determine the EH optimal solution. The performance of the proposed approach is evaluated through a comprehensive case study.
引用
收藏
页数:24
相关论文
共 36 条
[1]  
[Anonymous], 2010, Linear programming and network flows
[2]   Adaptive Robust Optimization for the Security Constrained Unit Commitment Problem [J].
Bertsimas, Dimitris ;
Litvinov, Eugene ;
Sun, Xu Andy ;
Zhao, Jinye ;
Zheng, Tongxin .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (01) :52-63
[3]   Robust Optimization for Transmission Expansion Planning: Minimax Cost vs. Minimax Regret [J].
Chen, Bokan ;
Wang, Jianhui ;
Wang, Lizhi ;
He, Yanyi ;
Wang, Zhaoyu .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2014, 29 (06) :3069-3077
[4]   Uncertain Linear Programs: Extended Affinely Adjustable Robust Counterparts [J].
Chen, Xin ;
Zhang, Yuhan .
OPERATIONS RESEARCH, 2009, 57 (06) :1469-1482
[5]   Modeling Carbon Emission Flow in Multiple Energy Systems [J].
Cheng, Yaohua ;
Zhang, Ning ;
Wang, Yi ;
Yang, Jingwei ;
Kang, Chongqing ;
Xia, Qing .
IEEE TRANSACTIONS ON SMART GRID, 2019, 10 (04) :3562-3574
[6]  
Conejo AJ, 2010, INT SER OPER RES MAN, V153, P1, DOI 10.1007/978-1-4419-7421-1
[7]   A new hybrid stochastic-robust optimization approach for self-scheduling of generation companies [J].
Dehghan, Shahab ;
Amjady, Nima ;
Vatani, Behdad ;
Zareipour, Hamidreza .
INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2016, 26 (06) :1244-1259
[8]   Reliability-Constrained Robust Power System Expansion Planning [J].
Dehghan, Shahab ;
Amjady, Nima ;
Conejo, Antonio J. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (03) :2383-2392
[9]   Two-Stage Robust Generation Expansion Planning: A Mixed Integer Linear Programming Model [J].
Dehghan, Shahab ;
Amjady, Nima ;
Kazemi, Ahad .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2014, 29 (02) :584-597
[10]   Short-Term Scheduling Strategy for Wind-Based Energy Hub: A Hybrid Stochastic/IGDT Approach [J].
Dolatabadi, Amirhossein ;
Jadidbonab, Mohammad ;
Mohammadi-ivatloo, Behnam .
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2019, 10 (01) :438-448