Fast Bus Protection Using IEC 61850

被引:0
|
作者
Goff, Cassandra H. [1 ]
Eltom, Ahmed H. [2 ]
Saeed, Haytham [2 ]
机构
[1] Tennessee Valley Author, 1101 Market St, Chattanooga, TN 37403 USA
[2] Univ Tennessee, Chattanooga, TN 37403 USA
来源
2015 51ST IEEE INDUSTRY APPLICATIONS SOCIETY ANNUAL MEETING | 2015年
关键词
Fast Bus; IEC; 61850; Interoperability; Time Allowed To Live; Local Area Network; Logical Node; GOOSE Message; Multicast Message; Virtual Local Area Network; Publisher; Data Set; Subscriber;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
International Electrotechnical Commission (IEC) 61850 is the latest technology that allows electric power utilities to build low cost digital substations. Because limited objective information is available, electric power utilities desire independent evaluations of IEC 61850 from end users. The objective of this study is to compare the IEC 61850 method to the hardwired method using actual hardware to find an optimal solution for the fast bus protection scheme. System disturbance clearing time, maintenance and construction costs, and interoperability between multivendor microprocessor-based relays were used as the criteria for this evaluation. This research measured the protection speed of the hardwired method and the IEC 61850 method for the fast bus protection scheme, utilizing relays from the same and mixed manufacturers. The results of the study show that IEC 61850 method is simple, cost efficient, and offers speed of operation comparable to the hardwired method.
引用
收藏
页数:8
相关论文
共 50 条
  • [41] Design and Performance Testing of a Multivendor IEC61850-9-2 Process Bus Based Protection Scheme
    Yang, Li
    Crossley, Peter A.
    Wen, An
    Chatfield, Ray
    Wright, John
    IEEE TRANSACTIONS ON SMART GRID, 2014, 5 (03) : 1159 - 1164
  • [42] A study on IEC 61850 based centralized 22.9kV bus protection considering time synchronization errors
    Song M.-H.
    Lee N.-H.
    Nam S.-R.
    Transactions of the Korean Institute of Electrical Engineers, 2019, 68 (08): : 965 - 971
  • [43] Rule Based Fault Tolerant Protection System using IEC 61850 Protocol
    Sheng, Su
    Chan, W. L.
    Shi Dongyuan
    Duan Xianzhong
    2010 IEEE INDUSTRY APPLICATIONS SOCIETY ANNUAL MEETING, 2010,
  • [44] Description of Protection Intelligent Center Using IEC61850 Defined SCL
    Ma, Xiaowei
    Bo, Zhiqian
    Wang, Lin
    Wang, Qingping
    Chen, Le
    Wei, Fanrong
    2015 5TH INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES (DRPT 2015), 2015, : 938 - 941
  • [45] Implementation of Arc-Flash Protection Using IEC 61850 Goose Messaging
    Cabrera, Charina
    Chiu, Stephen
    Nair, Nirmal Kumar C.
    2012 IEEE INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2012,
  • [46] Testing and Configuration of IEC 61850 Multivendor Protection Schemes
    Aguilar, R.
    Ariza, J.
    2010 IEEE PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXPOSITION: SMART SOLUTIONS FOR A CHANGING WORLD, 2010,
  • [47] Impacts of IEC 61850 digital substation on relaying protection
    He, Shi-En
    Liu, Jun
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2009, 37 (03): : 1 - 4
  • [48] IEC 61850 - A practical application primer for protection engineers
    Kasztenny, Bogdan
    Whatley, James
    Urden, Eric A.
    Burger, John
    Finney, Dale
    Adamiak, Mark
    2006 POWER SYSTEMS CONFERENCE ADVANCED METERING, PROTECTION, CONTROL, COMMUNICATION, AND DISTRIBUTED RESOURCES, 2006, : 18 - +
  • [49] Protection Coordination in Active Distribution Grids with IEC 61850
    Ishchenko, Dmitry
    Oudalov, Alexandre
    Stoupis, James
    2012 IEEE PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXPOSITION (T&D), 2012,
  • [50] Accelerating the protection schemes through IEC 61850 protocols
    Ali, N. H.
    Eissa, M. M.
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2018, 102 : 189 - 200