Fast Bus Protection Using IEC 61850

被引:0
|
作者
Goff, Cassandra H. [1 ]
Eltom, Ahmed H. [2 ]
Saeed, Haytham [2 ]
机构
[1] Tennessee Valley Author, 1101 Market St, Chattanooga, TN 37403 USA
[2] Univ Tennessee, Chattanooga, TN 37403 USA
来源
2015 51ST IEEE INDUSTRY APPLICATIONS SOCIETY ANNUAL MEETING | 2015年
关键词
Fast Bus; IEC; 61850; Interoperability; Time Allowed To Live; Local Area Network; Logical Node; GOOSE Message; Multicast Message; Virtual Local Area Network; Publisher; Data Set; Subscriber;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
International Electrotechnical Commission (IEC) 61850 is the latest technology that allows electric power utilities to build low cost digital substations. Because limited objective information is available, electric power utilities desire independent evaluations of IEC 61850 from end users. The objective of this study is to compare the IEC 61850 method to the hardwired method using actual hardware to find an optimal solution for the fast bus protection scheme. System disturbance clearing time, maintenance and construction costs, and interoperability between multivendor microprocessor-based relays were used as the criteria for this evaluation. This research measured the protection speed of the hardwired method and the IEC 61850 method for the fast bus protection scheme, utilizing relays from the same and mixed manufacturers. The results of the study show that IEC 61850 method is simple, cost efficient, and offers speed of operation comparable to the hardwired method.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] Review of Bus Differential Protection Using IEC 61850
    Lima, Diomar A. C.
    Bernardon, Daniel P.
    Morais, Adriano P.
    Oliveira, Aecio L.
    Hokama, Wagner S.
    Conceicao, Julia B. R.
    Sartori, Angelo F.
    ENERGIES, 2022, 15 (24)
  • [2] Simple bus protection based on IEC 61850
    Zhang, Chao
    Tan, Jiancheng
    Wei, Hua
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2013, 37 (22): : 79 - 83
  • [3] An IEC 61850 standard communication model for bus protection
    Sun, Yimin
    Chen, Yuansheng
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2007, 31 (02): : 51 - 54
  • [4] IEC 61850 Based Bus Protection - Principles and Benefits
    Apostolov, A.
    2009 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-8, 2009, : 3530 - 3535
  • [5] Reliability Evaluation of IEC 61850 Process Bus Architecture for Protection Function
    Mo, Jun
    Tan, Jiancheng
    ELECTRIC POWER COMPONENTS AND SYSTEMS, 2018, 46 (19-20) : 1993 - 2003
  • [6] System-Level Tests of Transformer Differential Protection Using an IEC 61850 Process Bus
    Ingram, David M. E.
    Schaub, Pascal
    Taylor, Richard R.
    Campbell, Duncan A.
    IEEE TRANSACTIONS ON POWER DELIVERY, 2014, 29 (03) : 1382 - 1389
  • [7] A Fast and Reliable Blocked Bus Bar Protection Scheme Leveraging on Sampled Value and GOOSE Protection based on IEC 61850 Architecture
    Kumar, Shantanu
    Abu-Siada, Ahmed
    Das, Narottam
    Islam, Syed
    PROCEEDINGS OF 2021 31ST AUSTRALASIAN UNIVERSITIES POWER ENGINEERING CONFERENCE (AUPEC), 2021,
  • [8] Implementation and Testing of Directional Comparison Bus Protection Based on IEC61850 Process Bus
    Zadeh, Mohammad R. D.
    Sidhu, Tarlochan S.
    Klimek, Andrew
    IEEE TRANSACTIONS ON POWER DELIVERY, 2011, 26 (03) : 1530 - 1537
  • [9] Design and Simulation of Fast Substation Protection in IEC 61850 Environments
    Valdes, Alfonso
    Hang, Cui
    Panumpabi, Prosper
    Vaidya, Nitin
    Drew, Chris
    Ischenko, Dimitry
    2015 WORKSHOP ON MODELING AND SIMULATION OF CYBER-PHYSICAL ENERGY SYSTEMS (MSCPES), 2015,
  • [10] Impact Evaluation of IEC 61850 Process Bus Architecture on Numerical Protection Systems
    Yang, Li
    Crossley, Peter A.
    Zhao, Jianguo
    Li, Haiyu
    An, Wen
    2009 INTERNATIONAL CONFERENCE ON SUSTAINABLE POWER GENERATION AND SUPPLY, VOLS 1-4, 2009, : 396 - +