The Human Factor in Transmission Network Expansion Planning: The Grid That a Sustainable Energy System Needs

被引:0
作者
Lumbreras, Sara [1 ]
David Gomez, Jesus [1 ]
Francisco Alvarez, Erik [1 ]
Huclin, Sebastien [2 ]
机构
[1] Univ Pontificia Comillas, ICAI Sch Engn, Inst Res Technol, Santa Cruz De Marcenado 26, Madrid 28015, Spain
[2] Basque Ctr Climate Change BC3, Sede Bldg 1,1st Floor,Sci Campus, Leioa 48940, Spain
关键词
power system expansion planning; power system operation; transmission expansion planning; REACTIVE POWER; DECOMPOSITION APPROACH; BENDERS DECOMPOSITION; GENERATION; MODEL; FRAMEWORK; LEVEL; SOLVE; COORDINATION; INVESTMENT;
D O I
10.3390/su14116746
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The decarbonization of the energy sector puts additional pressure on the transmission network. The main cause for this is that renewable sources are often more abundant in geographical areas far away from the main demand centers, so new transmission lines are required to connect the new renewable energy capacity. In addition, by connecting different geographical zones, the transmission network could smooth the intermittency and the variability of renewable energy production. Thus, the changing energy landscape leads to a need to reinforce the transmission network through the Network Transmission Expansion Planning. Ideally, all the idiosyncrasies of the electricity system are considered in the operation and expansion planning process. However, several critical dimensions of the planning process are routinely ignored since they may introduce parameters that are difficult to quantify and complexity that state-of-the-art planning methods cannot handle. This paper identifies the most relevant elements related to the human factor, which have been grouped around the main topics: the human behind the technical, the human at the institutional level, and the human at the individual level. This paper also provides an additional formulation that can be used to upgrade existing models to include the human element and discusses the implications of these upgrades.
引用
收藏
页数:22
相关论文
共 84 条
  • [1] Security-constrained transmission expansion planning: A stochastic multi-objective approach
    Akbari, Tohid
    Rahimi-Kian, Ashkan
    Bina, Mohammad Tavakoli
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2012, 43 (01) : 444 - 453
  • [2] Alvarez E.F., 2022, ELECTR POW SYST RES
  • [3] Semidefinite relaxation and generalised benders decomposition to solve the transmission expansion network and reactive power planning
    Alvarez, Erik F.
    Paredes, Miguel
    Rider, Marcos J.
    [J]. IET GENERATION TRANSMISSION & DISTRIBUTION, 2020, 14 (11) : 2160 - 2168
  • [4] [Anonymous], 2020, SCENARIO BUILDING GU
  • [5] Transmission Expansion and Reactive Power Planning Considering Wind Energy Investment Using A Linearized AC Model
    Arabpour, Abolfazi
    Besmi, Mohammad Reza
    Maghouli, Pouria
    [J]. JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, 2019, 14 (03) : 1035 - 1043
  • [6] A mixed integer disjunctive model for transmission network expansion
    Bahiense, L
    Oliveira, GC
    Pereira, M
    Granville, S
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (03) : 560 - 565
  • [7] Estimating the benefits of transmission expansion projects: An Aumann-Shapley approach
    Banez-Chicharro, Fernando
    Olmos, Luis
    Ramos, Andres
    Latorre, Jesus M.
    [J]. ENERGY, 2017, 118 : 1044 - 1054
  • [8] A new benders decomposition approach to solve power transmission network design problems
    Binato, S
    Pereira, MVF
    Granville, S
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (02) : 235 - 240
  • [9] The benefits of transmission expansions in the competitive electricity markets
    Bresesti, Paola
    Calisti, Roberto
    Cazzol, Maria Vittoria
    Gatti, Antonio
    Provenzano, Dario
    Vaiani, Andrea
    Vailati, Riccardo
    [J]. ENERGY, 2009, 34 (03) : 274 - 280
  • [10] Burandt T., 2018, DIW DATA DOC, V94, P1