Strengthening a 20-Year-Old Post-Tensioned Concrete Box Beam with Double-Layer Prestressed Steel Wire Ropes

被引:12
|
作者
Dai, Lizhao [1 ,2 ]
Wang, Lei [1 ]
Deng, Ming [3 ]
Wu, Binghui [1 ]
Floyd, Royce W. [4 ]
Zhang, Jianren [1 ]
机构
[1] Changsha Univ Sci & Technol, Sch Civil Engn & Architecture, 960 Wanjiali Rd, Changsha 410114, Hunan, Peoples R China
[2] Univ Lorraine, CNRS, UMR 7239, LEM3, F-57045 Metz 01, France
[3] Tianjin Transportat Res Inst, 25 Dongli Rd, Tianjin 300074, Peoples R China
[4] Univ Oklahoma, Sch Civil Engn & Environm Sci, 202 W Boyd St, Norman, OK 73019 USA
基金
中国国家自然科学基金;
关键词
Bridge engineering; Post-tensioned concrete box beam; Strengthening; Serviceability; Prestressed steel wire ropes; RC BEAMS; PERFORMANCE; STRANDS; STRESS; TESTS; UNITS;
D O I
10.1061/(ASCE)BE.1943-5592.0001301
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Overloading, corrosion, and material aging deteriorate the structural performance of prestressed concrete (PC) bridges. Strengthening techniques are needed to improve the serviceability and extend the life of these deteriorating bridges. This study examined a strengthening technique with double-layer prestressed steel wire ropes (PSWRs) to enhance the serviceability of an existing post-tensioned concrete box beam for the first time. The tested box beam was removed from a demolished 20-year-old bridge. The service-level behavior of the beam, before and after strengthening, was evaluated using four-point flexural loading. The enhancement effects of the double-layer PSWR on the service-level behavior of the beam are discussed, including details on deflection, crack width, and reinforcing steel stress. Results show that PSWR strengthening is a feasible method for improving the serviceability of post-tensioned concrete box beams. The restraining effect of PSWR on crack development is more significant than the effect on deflection and reinforcing steel stress. Crack width, deflection, and reinforcing steel stress under the code-specified service load decreased by 50, 23, and 21%, respectively, after strengthening.
引用
收藏
页数:11
相关论文
共 2 条
  • [1] Shear strengthening of reinforced concrete beam with prestressed steel wire ropes
    Yu T.-L.
    Li H.-S.
    Huang W.
    Wang S.-J.
    Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2019, 49 (04): : 1134 - 1143
  • [2] The effect of wire rupture on flexural behavior of 45-year-old post-tensioned concrete bridge girders
    Jeon, Chi-Ho
    Sim, Chhengty
    Shim, Chang-Su
    ENGINEERING STRUCTURES, 2021, 245