Supervisory factory control based on real-time production feedback

被引:46
作者
Chang, Qing
Ni, Jun
Bandyopadhyay, Pulak
Biller, Stephan
Xiao, Guoxian
机构
[1] Gen Motors, Ctr Res & Dev, Mfg Syst Res Lab, Warren, MI 48090 USA
[2] Univ Michigan, Dept Mech Engn, Ann Arbor, MI 48109 USA
来源
JOURNAL OF MANUFACTURING SCIENCE AND ENGINEERING-TRANSACTIONS OF THE ASME | 2007年 / 129卷 / 03期
关键词
bottleneck analysis; bottleneck inertia; real-time production control; throughput simulation;
D O I
10.1115/1.2673666
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
One key characteristic of any process performance is variability; that is, a process rarely performs consistently over time. The bottleneck is one of the main reasons causing the system variability and fluctuation in production. Short-term production analysis and short-term bottleneck identification are imperative to enable manufacturing operations to optimally respond to dynamic changes in system behavior. However, conventional throughput and bottleneck analysis focus on long-term statistic bottleneck identification, which is usually not applicable to a short-term period. An on-line supervisory control method is introduced to. search for short-term production constraints with unknown machine reliability distribution and mitigate those constraints to improve system throughput. The control mechanism uses playback simulation of the real production data to identify the bottleneck station, and control parameters of that station to reach a near balanced production line operation by understanding the bottleneck inertia phenomenon. The results ensure the smooth flow of products on the production line and increase the line's performance.
引用
收藏
页码:653 / 660
页数:8
相关论文
共 22 条
[1]  
ANUPINDI R, 1999, MANAGING BUSINESS PR, P199
[2]   SCHEDULING MANUFACTURING SYSTEMS WITH WORK-IN-PROCESS INVENTORY CONTROL - SINGLE-PART-TYPE SYSTEMS [J].
BAI, SX ;
GERSHWIN, SB .
IIE TRANSACTIONS, 1995, 27 (05) :599-617
[3]  
Buxey GM., 1973, AIIE Transactions, V5, P37, DOI DOI 10.1080/05695557308974880
[4]  
Buzacott J.A., 1993, STOCHASTIC MODELS MA
[5]   MODELS OF AUTOMATIC TRANSFER LINES WITH INVENTORY BANKS - REVIEW AND COMPARISON [J].
BUZACOTT, JA ;
HANIFIN, LE .
AIIE TRANSACTIONS, 1978, 10 (02) :197-207
[6]  
CASSANDRAS CG, 1999, INTRO DISCRETE EVENT, P664
[7]  
Chiadamrong N., 2003, International Journal of Manufacturing Technology and Management, V5, P149, DOI 10.1504/IJMTM.2003.002538
[8]   c-bottlenecks in serial production lines: Identification and application [J].
Chiang, SY ;
Kuo, CT ;
Meerkov, SM .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2001, 7 (06) :543-578
[9]  
Dallery Y., 1992, Queueing Systems Theory and Applications, V12, P3, DOI 10.1007/BF01158636
[10]   Control-theoretic analysis of a closed-loop PPC system [J].
Duffie, N ;
Falu, I .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2002, 51 (01) :379-382