Heuristic approach and application for rebalancing of a mixed-model assembly line

被引:4
作者
Ishigaki, Aya [1 ]
机构
[1] Tokyo Univ Sci, Dept Ind Adm, 2641 Yamazaki, Noda, Chiba 2788510, Japan
基金
日本学术振兴会;
关键词
Production scheduling; Task assignment; Mixed-model assembly lines; Rebalancing; Heuristic method; WORK OVERLOAD;
D O I
10.1299/jamdsm.2018jamdsm0078
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The diversification of customer needs and the shortening of product life cycle have increased the significance of small batch production. The growth of interest in environmental issues has generated a focus on methods such as recycling and reuse. Therefore, companies must pay attention to the environmental impact of their production cycle, discharge their social responsibility, and maintain their competitive advantage. In this research, we addressed the mixed-model assembly line, which is used to assemble or remanufacture multiple items simultaneously. Despite their versatility, these assembly lines carry a high risk of line stoppages, especially in dynamic environments. We describe the task assignment problem and item process sequencing problem of a mixed-model assembly line with multiple stations. A heuristic method for solving each of these problems was investigated.
引用
收藏
页数:10
相关论文
共 23 条
[1]   AN ANALYTIC FRAMEWORK FOR SEQUENCING MIXED MODEL ASSEMBLY LINES [J].
BARD, JF ;
DAREL, E ;
SHTUB, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (01) :35-48
[2]   Minimizing work overload in mixed-model assembly lines [J].
Bautista, Joaquin ;
Cano, Jaime .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (01) :177-191
[3]   Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules [J].
Bautista, Joaquin ;
Cano, Alberto .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 210 (03) :495-513
[4]   A dynamic programming based heuristic for the assembly line balancing problem [J].
Bautista, Joaquin ;
Pereira, Jordi .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 194 (03) :787-794
[5]   Sequencing mixed-model assembly lines: Survey, classification and model critique [J].
Boysen, Nils ;
Fliedner, Malte ;
Scholl, Armin .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 192 (02) :349-373
[6]   A DYNAMIC-PROGRAMMING APPROACH TO STOCHASTIC ASSEMBLY LINE BALANCING [J].
CARRAWAY, RL .
MANAGEMENT SCIENCE, 1989, 35 (04) :459-471
[7]  
Domschke M., 1996, Z BETRIEBSWIRT, V66, P1465
[8]   Development of search method for sequencing problem in mixed-model assembly lines [J].
Ishigaki, Aya ;
Miyashita, Tomoyuki .
JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2016, 10 (03)
[9]   ON DYNAMIC-PROGRAMMING METHODS FOR ASSEMBLY LINE BALANCING [J].
KAO, EPC ;
QUEYRANNE, M .
OPERATIONS RESEARCH, 1982, 30 (02) :375-390
[10]  
Kotani S., 2007, J JAPAN IND MANAGEME, V58, P361