Computer-aided prototyping of production flows for a virtual enterprise

被引:22
作者
Banaszak, Z [1 ]
Skolud, B
Zaremba, MB
机构
[1] Polish Acad Sci, Syst Res Inst, Lab Knowledge & Artificial Intelligence Syst, PL-5449 Wroclaw, Poland
[2] Silesian Tech Univ, Dept Engn Proc Automat & Integrated Mfg Syst, Gliwice, Poland
[3] Univ Quebec, Dept Informat & Ingn, Hull, PQ J8X 3X7, Canada
关键词
virtual enterprise; production flow; constraints theory; performance evaluation; logistics; modeling;
D O I
10.1023/A:1022291313614
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper presents a logistics framework to cope with the problem of planning and control of production flows processed on a set of work cells distributed among component firms of a virtual enterprise (VE). The constraints theory framework is employed to study constraint-based production flow coordination rules. The article discusses relationships linking structural parameters (e.g. buffer capacity, machine tool efficiency, and automated storage/retrieval systems) of VE components with material flow control guaranteeing efficient completion of work orders, and specified by such parameters as batch delivery periods, work-in-process (WIP) and make-span. The results are summarized in the form of a performance evaluation scheme. Examples using a software package the implements the proposed flow coordination methodology are provided.
引用
收藏
页码:83 / 106
页数:24
相关论文
共 35 条
  • [31] ULFSBY S, 1990, P 6 CIM EUR ANN C 15, P153
  • [32] VAARIO J, 1996, JAP US S FLEX AUT, V2, P1481
  • [33] VANDAELE NJ, 1997, 4 IFAC WORKSH INT MA, P171
  • [34] Performance evaluation for concurrent processing in cyclic systems
    Zaremba, MB
    Banaszak, ZA
    [J]. CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 1995, 3 (02): : 123 - 130
  • [35] ZAREMBA MB, 1999, P 14 TRIENN WORLDS C, VA, P1