Estimating a Risk-Integrated Schedule Delay for an Office Building Renovation Project by Considering the Project's Attributes

被引:9
作者
Cho, Kyuman [1 ]
Kim, Taehoon [1 ]
Hong, Taehoon [2 ]
机构
[1] Chosun Univ, Sch Architecture, 309 Pilmun Daero, Gwangju 61452, South Korea
[2] Yonsei Univ, Dept Architecture & Architectural Engn, 50 Yonsei Ro, Seoul 03722, South Korea
基金
新加坡国家研究基金会;
关键词
Building renovation works; Risk; Project attributes; Schedule delays;
D O I
10.1061/(ASCE)ME.1943-5479.0000732
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Despite frequent reports of work delays in renovation projects due to inherent characteristics, such as difficulties in diagnosing the status of existing buildings, studies addressing this issue are lacking. Therefore, this study aims to develop a new method to predict the delay probabilities of renovations according to the attributes of the renovation projects. To achieve this objective, with focus on the inherent factors of renovation projects, two core concepts are established: (1) risk probability according to project attribute; and (2) delay probability for renovation depending on risk probability. By performing case studies on four actual projects, the probabilities of risk factors for each project were confirmed based on project attributes; furthermore, delay probabilities for the renovations of each project were accurately estimated. Thus, this research is expected to assist real estate investors in selecting potential buildings for investment by considering inherent risk factors and delay probabilities owing to renovations.
引用
收藏
页数:14
相关论文
共 32 条
[1]  
홍성욱, 2004, [Journal of the Architectural Institute of Korea Structure & Construction, 대한건축학회논문집 구조계], V20, P153
[2]   Changes in renovation policies in the era of sustainability [J].
Baek, Cheong-Hoon ;
Park, Sang-Hoon .
ENERGY AND BUILDINGS, 2012, 47 :485-496
[3]   Empirical Study of Factors Influencing Schedule Delays of Public Construction Projects in Burkina Faso [J].
Bagaya, Ousseni ;
Song, Jinbo .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (05)
[4]  
조규만, 2018, [Korean Journal of Construction Engineering and Management, 한국건설관리학회 논문집], V19, P22
[5]  
Cho K., 2018, J KOREAN I BUILD CON, V18, P385, DOI [10.5345/JKIBC.2018.18.4.385, DOI 10.5345/JKIBC.2018.18.4.385]
[6]   Decision support method for estimating monetary value of post-renovation office buildings [J].
Cho, Kyuman ;
Kim, Jungwoo ;
Kim, Taehoon .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 2019, 46 (12) :1103-1113
[7]   Decision Support Model for Determining Cost-Effective Renovation Time [J].
Cho, Kyuman ;
Yoon, Yoojung .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (03)
[8]  
Choi B, 2002, THESIS
[9]   Cost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines [J].
Choudhry, Rafiq M. ;
Aslam, Mohammad A. ;
Hinze, Jimmie W. ;
Arain, Faisal M. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (07)
[10]  
Croome K, 2016, AM J TRANSPLANT, V16, P70