A note on the optimal makespan of a parallel machine scheduling problem

被引:0
|
作者
Li, Yumei [1 ]
Gu, Yundong [2 ]
Sun, Kaibiao [3 ]
Li, Hongxing [3 ]
机构
[1] Beijing Technol & Business Univ, Sch Informat Engn, Beijing 100037, Peoples R China
[2] N China Elect Power Univ, Sch Math & Phys, Beijing 102206, Peoples R China
[3] Beijing Normal Univ, Sch Math Sci, Beijing 100875, Peoples R China
来源
FUZZY INFORMATION AND ENGINEERING, PROCEEDINGS | 2007年 / 40卷
基金
中国国家自然科学基金;
关键词
scheduling problem; parallel machine; algorithm; result schedule; optimal makespan;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
For the parallel machine scheduling problem under consideration, the authors in two literatures of 1961 and 2002 respectively gave the proofs for the optimal makespan under Level Algorithm. But, some errors in their proofs are found by us with three counterexamples, and no one has given the correct proof until now. In this paper, a new algorithm is proposed. And the new algorithm is more convenient and easier for theoretical analysis than Level Algorithm does. Then, it is showed that the result schedule obtained by using the new algorithm is consistent with that by Level Algorithm in the sense that they can give the same result schedule. Finally, by using the proposed new algorithm, the proof for the optimal makespan is accomplished.
引用
收藏
页码:481 / +
页数:2
相关论文
共 50 条