Integration of disassembly leveling and bin assignment for demanufacturing automation

被引:26
作者
Gao, MM [1 ]
Zhou, MC
Caudill, RJ
机构
[1] New Jersey Inst Technol, Dept Elect & Comp Engn, Newark, NJ 07102 USA
[2] Chinese Acad Sci, Inst Automat, Beijing 100080, Peoples R China
来源
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION | 2002年 / 18卷 / 06期
关键词
demanufacturing system design; disassembly automation; lifecycle engineering; system optimization;
D O I
10.1109/TRA.2002.805650
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
As an integral part of a product life cycle, demanufacturing is a process of disassembling a product and assigning collection bins for the resultant subassemblies and parts, which are then reused, remanufactured, reengineered, or disposed of. This paper proposes an algorithm to determine disassembly levels and bins in an integrated way to maximize the profit from a used product through balancing the resource invested in disassembly processes, the return, and the environmental impact caused by them. The algorithm utilizes the information from a computer-aided design system and requires minimal user input with the computational complexity of O(n(2) + mn), where n is the number of parts and final subassemblies in a product, and m is the number of collection bins. It has been successfully used in the development of a demanufacturing stage of a multi-lifecycle assessment and analysis tool. The benefit of the proposed algorithm is illustrated through a laptop computer example.
引用
收藏
页码:867 / 874
页数:8
相关论文
共 15 条
  • [1] Baase Sara, 1988, Computer Algorithms: Introduction to Design and Analysis, V2
  • [2] Bhamra Tracy, 1997, P 32 INT MAT C, P85, DOI [10.1007/978-1, DOI 10.1007/978-1]
  • [3] CAUDILL RJ, 2001, MECH LIFECYCLE ENG G
  • [4] Fuzzy Reasoning Petri Nets for demanufacturing process decision
    Gao, MM
    Zhou, MC
    [J]. PROCEEDINGS OF THE 2001 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS AND THE ENVIRONMENT, CONFERENCE RECORD, 2001, : 167 - 172
  • [5] Issues in environmentally conscious manufacturing and product recovery: a survey
    Gungor, A
    Gupta, SM
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 36 (04) : 811 - 853
  • [6] JOVANE F, 1993, ANN CIRP, V42, P640
  • [7] Lund R.T., 1996, The Remanufacturing Industry: Hidden Giant
  • [8] Disassembly complexity and recyclability analysis of new designs from CAD file data
    Mani, V
    Das, S
    Caudill, R
    [J]. PROCEEDINGS OF THE 2001 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS AND THE ENVIRONMENT, CONFERENCE RECORD, 2001, : 10 - 15
  • [9] Tang Y., 2000, Proceedings 2000 ICRA. Millennium Conference. IEEE International Conference on Robotics and Automation. Symposia Proceedings (Cat. No.00CH37065), P2197, DOI 10.1109/ROBOT.2000.846354
  • [10] An integrated approach to disassembly planning and demanufacturing operation
    Tang, Y
    Zhou, MC
    Caudill, RJ
    [J]. IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2001, 17 (06): : 773 - 784