Disassembly scheduling problem: literature review and future research directions

被引:15
作者
Slama, Ilhem [1 ,2 ]
Ben-Ammar, Oussama [1 ]
Masmoudi, Faouzi [3 ]
Dolgui, Alexandre [1 ]
机构
[1] IMT Atlantique, LS2N, UMR CNRS 6004, 4 Rue Alfred Kastler BP 20722, F-44307 Nantes, France
[2] Univ Sfax, Fac Econ & Management Sci Sfax, Lab Modeling & Optimizat Decis Ind & Logist Syst, Airport Rd Km 4,BP 1088, Sfax 3018, Tunisia
[3] Univ Sfax, Engn Sch Sfax, Lab Mech Modeling & Prod LA2MP, Sfax, Tunisia
来源
IFAC PAPERSONLINE | 2019年 / 52卷 / 13期
关键词
Reverse logistic; disassembly scheduling; literature review; Research directions; MULTIPLE PRODUCT TYPES; PARTS COMMONALITY; REVERSE MRP; HEURISTICS; ALGORITHM; YIELD;
D O I
10.1016/j.ifacol.2019.11.225
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents a literature review on disassembly scheduling problem, one of the important operational problems in disassembly systems. It can be generally defined as the problem of determining the timing and quantity of the end-of-life products while satisfying the demand of their parts/sub-assemblies over a given planning horizon. First, we review the existing research papers on disassembly scheduling problem and analyze the different models and methods of resolution used to solve this problem. Then, the complexity of product structures is discussed. Finally, we suggest several future research directions. Further study is still needed to address the stochastic parameters, the limit on product return, extra capacity and the setup time in the disassembly scheduling problem. (C) 2019, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All rights reserved.
引用
收藏
页码:601 / 606
页数:6
相关论文
共 44 条
[1]   Lot sizing in reverse MRP for scheduling disassembly [J].
Barba-Gutierrez, Y. ;
Adenso-Diaz, B. ;
Gupta, S. M. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 111 (02) :741-751
[2]   Reverse MRP under uncertain and imprecise demand [J].
Barba-Gutierrez, Y. ;
Adenso-Diaz, B. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 40 (3-4) :413-424
[3]  
Chen W.-H., 1990, Annals of Operations Research, V26, P29, DOI 10.1007/BF02248584
[4]  
Dong-Hyun Kim, 2011, 2011 IEEE/SICE International Symposium on System Integration (SII 2011), P762, DOI 10.1109/SII.2011.6147544
[5]   DETERMINISTIC PRODUCTION PLANNING WITH CONCAVE COSTS AND CAPACITY CONSTRAINTS [J].
FLORIAN, M ;
KLEIN, M .
MANAGEMENT SCIENCE SERIES A-THEORY, 1971, 18 (01) :12-20
[6]   DETERMINISTIC PRODUCTION PLANNING - ALGORITHMS AND COMPLEXITY [J].
FLORIAN, M ;
LENSTRA, JK ;
RINNOOYKAN, AHG .
MANAGEMENT SCIENCE, 1980, 26 (07) :669-679
[7]  
Gagnon Roger J., 2014, International Journal of Rapid Manufacturing, V4, P179, DOI 10.1504/IJRAPIDM.2014.066030
[8]   A Genetic Algorithm for Disassembly Scheduling with Assembly Product Structure [J].
Gao, Nan ;
Chen, Weida .
IEEE/SOLI'2008: PROCEEDINGS OF 2008 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, VOLS 1 AND 2, 2008, :2238-2243
[9]  
Godichaud M, 2015, 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), P1329, DOI 10.1109/IESM.2015.7380324
[10]   SCHEDULING DISASSEMBLY [J].
GUPTA, SM ;
TALEB, KN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (08) :1857-1866