Development for Extending the Beam Pulse Length of the DIII-D Neutral Beam System

被引:0
|
作者
Hong, R. -M. [1 ]
Chiu, H. K. [1 ]
Scoville, J. T. [1 ]
机构
[1] Gen Atom, San Diego, CA 92186 USA
关键词
neutral beam; ion source; long pulse; DIII-D;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The DIII-D fusion research tokamak utilizes seven neutral beam ion sources for plasma heating and current drive. These ion sources and the neutral beam system have performed with high availability and reliability since 1987. Experimental research has accomplished extensive understanding and insights of plasma physics, and requires more beam system capability to provide flexibility and enhancing scope of physics experiments. Extending the beam pulse length without lowering the beam power is one of the goals for the next 5 years. Currently, deuterium beam pulse length of ion source operated at 80 keV is limited to 3 s due to heat handling capability of some beamline internal components, which are used to collimate beam or to protect other beamline components from being damaged by residual (un-neutralized) energetic ions. A systematic study based on actual heating of beamline internal components has been performed to develop a plan for extending the beam pulse length to more than twice the current operating limit. This study using temperature rise of thermocouples embedded in the beamline internal components and data extrapolation obtained the beam pulse limitation for each beamline internal component identified that the pole shield of the residual ion bending magnet is the component that limits the beam pulse length to 3 s for 80 keV beam operation. Beam pulse length at 80 keV can be doubled with the upgrade of the magnet pole shield alone. Temperature rise measurements also showed that a drift duct (the section connecting beamline and tokamak vessel) made of stainless steel will be able to handle the heat from the re-ionized neutral particles. In addition to beamline internal components, long pulse beam operation of ion sources and other beam subsystems need to be operationally confirmed. Tests have shown ion source, control system, pumping and cooling systems, and power supply system operated flawlessly at beam energy of 60 keV for 10 s. It gave us confidence that the current DIII-D neutral beam system could operate at least twice the current beam pulse length after upgrade of the magnet pole shield.
引用
收藏
页码:440 / 443
页数:4
相关论文
共 50 条
  • [1] Modeling and experimental studies of the DIII-D neutral beam system
    Crowley, B.
    Rauch, J.
    Scoville, J. T.
    FUSION ENGINEERING AND DESIGN, 2015, 96-97 : 443 - 446
  • [2] Measurement of neutral beam profiles at DIII-D
    Chiu, H
    FUSION TECHNOLOGY, 1998, 34 (03): : 564 - 567
  • [3] Recent improvements to the DIII-D neutral beam instrumentation and control system
    Kellman, DH
    Hong, R
    17TH IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, VOLS 1 AND 2, 1998, : 807 - 810
  • [4] DIII-D tokamak control and neutral beam computer system upgrades
    Penaflor, BG
    McHarg, BB
    Piglowski, DA
    Pham, D
    Phillips, JC
    FUSION ENGINEERING AND DESIGN, 2004, 71 (1-4) : 5 - 9
  • [5] Power and particle deposition modeling for DIII-D neutral beam system
    Crowley, B.
    Rauch, J.
    Torreblanca, H.
    Liang, L.
    Xie, Y.
    Scoville, J. T.
    FUSION ENGINEERING AND DESIGN, 2017, 123 : 500 - 503
  • [6] Calculated Beam Profiles for the DIII-D Off-Axis and Long Pulse Neutral Beam Upgrade
    Chiu, H. K.
    Hong, R. M.
    Scoville, J. T.
    2009 23RD IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, 2009, : 460 - 463
  • [7] Automated calculation of DIII-D neutral beam availability
    Phillips, JC
    Hong, RM
    Scoville, BG
    18TH IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, 1999, : 511 - 514
  • [8] Physics and Engineering Issues Associated with Increasing Beam Energy on the DIII-D Neutral Beam System
    Crowley, B.
    Rauch, J.
    Scoville, J. T.
    Sharma, S. K.
    Choksi, B.
    2015 IEEE 26TH SYMPOSIUM ON FUSION ENGINEERING (SOFE), 2015,
  • [9] Extending DIII-D Neutral Beam modulated operations with a CAMAC based total on time interlock
    Baggest, DS
    Broesch, JD
    Phillips, JC
    18TH IEEE/NPSS SYMPOSIUM ON FUSION ENGINEERING, 1999, : 503 - 506
  • [10] New capabilities and upgrade path for the DIII-D neutral beam heating system
    Scoville, J. T.
    Boyer, M. D.
    Crowley, B. J.
    Eidietis, N. W.
    Pawley, C. J.
    Rauch, J. M.
    FUSION ENGINEERING AND DESIGN, 2019, 146 : 6 - 9