Development of a practical model of partnering for construction projects

被引:40
作者
Cheng, EWL [1 ]
Li, H [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon, Hong Kong, Peoples R China
关键词
D O I
10.1061/(ASCE)0733-9364(2004)130:6(790)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a practical model of partnering, which integrates the processes and associated components for partnering espousal. It intends to use the concept of modeling to integrate the aspects of system and process to form a model for practicing partnering. Therefore, a system-process model that is called the procedural mapping model (PMM) is developed, which adopts a more systematic approach to modeling construction partnering, including the identification of the core practices and activities. The PMM forms the basis for designing the key elements of the practical model of partnering that involves three major establishments including interactive process description, success factors' monitoring, and goals' assessment matrices. Individual components of these establishments have also been described.
引用
收藏
页码:790 / 798
页数:9
相关论文
共 25 条
[1]  
[Anonymous], 1997, Towards Positive Partnering
[2]  
Belassi W., 1996, INT J PROJ MANAG, V14, P141
[3]  
Carr F., 1999, PARTNERING CONSTRUCT
[4]   Construction partnering process and associated critical success factors: Quantitative investigation [J].
Cheng, EWL ;
Li, H .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (04) :194-202
[5]   Infrastructure of partnering for construction projects [J].
Cheng, EWL ;
Li, H ;
Drew, DS ;
Yeung, N .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2001, 17 (04) :229-237
[6]   Establishment of critical success factors for construction partnering [J].
Cheng, EWL ;
Li, H ;
Love, PED .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2000, 16 (02) :84-92
[7]  
Cheng EWL., 2001, Eng Constr Archit Manage, V8, P292, DOI [DOI 10.1108/EB021190, DOI 10.1046/J.1365-232X.2001.00210.X]
[8]  
CLARKE A, 1997, BUSINESS PROCESS MAN, V3, P248, DOI DOI 10.1108/14637159710192293
[9]   Partnering process model [J].
Crane, TG ;
Felder, JP ;
Thompson, PJ ;
Thompson, MG ;
Sanders, SR .
JOURNAL OF MANAGEMENT IN ENGINEERING, 1997, 13 (03) :57-63
[10]   BEYOND ADR - WORKING TOWARD SYNERGISTIC STRATEGIC PARTNERSHIP [J].
ELLISON, SD ;
MILLER, DW .
JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (06) :44-54