Optimization of component reliability in the design phase of capital goods

被引:75
作者
Oner, K. B. [1 ]
Kiesmuller, G. P. [1 ]
van Houtum, G. J. [1 ]
机构
[1] Eindhoven Univ Technol, Sch Ind Engn, NL-5600 MB Eindhoven, Netherlands
关键词
Capital goods; Reliability; Spare parts inventory; Life cycle costs; WARRANTY POLICIES; PRODUCT WARRANTY; SYSTEM; ALLOCATION; MODEL;
D O I
10.1016/j.ejor.2010.01.030
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We introduce a quantitative model to support the decision on the reliability level of a critical component during its design. We consider an OEM who is responsible for the availability of its systems in the field through service contracts. Upon a failure of a critical part in a system during the exploitation phase, the failed part is replaced by a ready-for-use part from a spare parts inventory. In an out-of-stock situation, a costly emergency procedure is applied. The reliability levels and spare parts inventory levels of the critical components are the two main factors that determine the downtime and corresponding costs of the systems. These two levels are decision variables in our model. We formulate the portions of Life Cycle Costs (LCC) which are affected by a component's reliability and its spare parts inventory level. These costs consist of design costs, production costs, and maintenance and downtime costs in the exploitation phase. We conduct exact analysis and provide an efficient optimization algorithm. We provide managerial insights through a numerical experiment which is based on real-life data. (C) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:615 / 624
页数:10
相关论文
共 20 条
[1]  
[Anonymous], EUROPEAN J OPERATION
[2]   MATHEMATICAL-MODELS FOR ANALYSIS OF WARRANTY POLICIES [J].
BLISCHKE, WR .
MATHEMATICAL AND COMPUTER MODELLING, 1990, 13 (07) :1-16
[3]   CONVEXITY PROPERTIES OF THE ERLANG LOSS FORMULA [J].
HAREL, A .
OPERATIONS RESEARCH, 1990, 38 (03) :499-505
[4]   Optimal reliability, warranty and price for new products [J].
Huang, Hong-Zhong ;
Liu, Zhijie ;
Murthy, D. N. P. .
IIE TRANSACTIONS, 2007, 39 (08) :819-827
[5]  
Hussain AZMO, 1998, IIE TRANS, V30, P1191, DOI 10.1023/A:1007592605372
[6]  
Hussain AZMO, 2003, MATH COMPUT MODEL, V38, P1211, DOI [10.1016/S0895-7177(03)90122-1, 10.1016/S0895-7177(03)00333-9]
[7]   A QUEUING MODEL FOR AN INVENTORY PROBLEM [J].
KARUSH, W .
OPERATIONS RESEARCH, 1957, 5 (05) :693-703
[8]  
Kim S.H., 2007, Reliability or inventory? Contracting strategies for after-sales product support
[9]   Performance contracting in after-sales service supply chains [J].
Kim, Sang-Hyun ;
Cohen, Morris A. ;
Netessine, Serguei .
MANAGEMENT SCIENCE, 2007, 53 (12) :1843-1858
[10]   Cost optimization in the (S-1, S) lost sales inventory model with multiple demand classes [J].
Kranenburg, A. A. ;
van Houtum, G. J. .
OPERATIONS RESEARCH LETTERS, 2007, 35 (04) :493-502