Parallel shuttle bus service design for planned mass rapid transit shutdown: The Singapore experience

被引:26
作者
Dou, Xueping [1 ]
Wang, Hua [1 ,2 ]
Meng, Qiang [1 ]
机构
[1] Natl Univ Singapore, Dept Civil & Environm Engn, Singapore 117576, Singapore
[2] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
关键词
Parallel shuttle bus service; Bus route design; Bus terminal selection; Bus deployment; Bus berth assignment; NETWORK DESIGN; ROUTE; MANAGEMENT; ALGORITHM; RECOVERY;
D O I
10.1016/j.trc.2019.09.022
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
19 MRT stations in Singapore experienced a two full-day shutdown as planned in order to upgrade the infrastructure of aging mass rapid transit (MRT) lines. A large bus fleet, running entirely parallel to MRT lines, was deployed to ferry passengers between affected stations, which however results in prolonged congestion and queue of buses near terminals. Rail transit systems in many metropolitan areas are threatened because of aging infrastructure. This study, motivated by the Singapore case, proposes a novel parallel shuttle bus service design (PSBSD) problem that addresses route design, terminal selection, berth allocation, and bus deployment to minimize inconvenience caused to passengers, which is seldom addressed in previous studies. We further develop a mixed-integer nonlinear programming (MINLP) model for the PSBSD problem. In order to solve the non-convex MINLP model optimally, we put forward an effective decomposition method, which comprises (i) the generation of candidate shuttle bus routes through a brute-force search for semi-route and a terminal selection procedure and (ii) the deployment of buses and assignment of terminal berths for selected shuttle bus routes by using an optimization-based approach. Numerical experiments were conducted using data sets from the MRT closure incident in Singapore. The results demonstrate that the decomposition method is capable of finding optimal solutions. Useful insights are also obtained from testing the models under different scenarios.
引用
收藏
页码:340 / 356
页数:17
相关论文
共 32 条
[1]   A column-generation approach to line planning in public transport [J].
Borndoerfer, Ralf ;
Groetschel, Martin ;
Pfetsch, Marc E. .
TRANSPORTATION SCIENCE, 2007, 41 (01) :123-132
[2]  
Burer S., 2012, SURV OPER RES MANAGE, V17, P97, DOI [DOI 10.1016/J.SORMS.2012.08.001, 10.1016/j.sorms.2012.08.001]
[3]   BUS NETWORK DESIGN [J].
CEDER, A ;
WILSON, NHM .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1986, 20 (04) :331-344
[4]   Mixed-integer programming model and branch-and-price-and-cut algorithm for urban bus network design and timetabling [J].
Chu, James C. .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2018, 108 :188-216
[5]   A model for setting services on auxiliary bus lines under congestion [J].
Codina, E. ;
Marin, A. ;
Lopez, F. .
TOP, 2013, 21 (01) :48-83
[6]   Bus schedule coordination for the last train service in an intermodal bus-and-train transport network [J].
Dou, Xueping ;
Meng, Qiang ;
Guo, Xiucheng .
TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2015, 60 :360-376
[7]  
Gu W., 2018, P TRANSP RES BOARD 9
[8]   Plan-based flexible bus bridging operation strategy [J].
Gu, Wei ;
Yu, Jie ;
Ji, Yuxiong ;
Zheng, Yujing ;
Zhang, H. Michael .
TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2018, 91 :209-229
[9]   Transit network design and scheduling: A global review [J].
Guihaire, Valerie ;
Hao, Jin-Kao .
TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2008, 42 (10) :1251-1273
[10]   Managing Unplanned Rail Disruptions: Policy Implications and Guidelines Towards an Effective Bus Bridging Strategy [J].
Itani, Alaa ;
Aboudina, Aya ;
Diab, Ehab ;
Srikukenthiran, Siva ;
Shalaby, Amer .
TRANSPORTATION RESEARCH RECORD, 2019, 2673 (04) :473-489