共 50 条
[41]
Trust System Architecture for Securing GOOSE Communication in IEC 61850 Substation Network
[J].
INTERNATIONAL JOURNAL OF SECURITY AND ITS APPLICATIONS,
2016, 10 (04)
:289-302
[43]
Electrical Substation Automation System Modernization through the Adoption of IEC61850
[J].
2015 IEEE/IAS 51ST INDUSTRIAL & COMMERCIAL POWER SYSTEMS TECHNICAL CONFERENCE (I&CPS),
2015,
[44]
Pitfalls of implementing multi-vendor IEC 61850 Substation Automation Systems
[J].
2017 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE - LATIN AMERICA (ISGT LATIN AMERICA),
2017,
[46]
An Integrative Approach to Reliability Analysis of an IEC 61850 Digital Substation
[J].
2012 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING,
2012,
[47]
On Automatic Generation of IEC61850/IEC61499 Substation Automation Systems Enabled by Ontology
[J].
IECON 2014 - 40TH ANNUAL CONFERENCE OF THE IEEE INDUSTRIAL ELECTRONICS SOCIETY,
2014,
:3577-3583
[49]
Performance Testing of IEC 61850 Based Architecture for UK National Grid Standardised Substation Automation Solutions
[J].
2015 IEEE POWER & ENERGY SOCIETY GENERAL MEETING,
2015,