An innovative method for project control in LNG project through 5D CAD: A case study

被引:23
|
作者
Wang, Xiangyu [1 ,2 ]
Yung, Ping [1 ]
Luo, Hanbin [3 ]
Truijens, Martijn [4 ]
机构
[1] Curtin Univ, Australasian Joint Res Ctr Bldg Informat Modellin, Perth, WA 6845, Australia
[2] Kyung Hee Univ, Dept Housing & Interior Design, Seoul, South Korea
[3] Huazhong Univ Sci & Technol, Sch Civil Engn & Mech, Wuhan 430074, Peoples R China
[4] Woodside Energy Ltd, Perth, WA 6000, Australia
关键词
50; CAD; LNG; Project control; Earned value analysis; Visualized report; CONTROL-SYSTEM; COST; BIM;
D O I
10.1016/j.autcon.2014.05.011
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Current studies on 50 CAD have been limited to either description of concept or automatic generation of quantities. Few have attempted to explore the other capabilities of 5D CAD. Project cost control and schedule control are very important for successful project delivery, while existing studies on computer based project control tools have largely focused only on schedule control. This paper fills the gap by investigating the possibility of using 5D CAD for project cost and schedule control. Initiated by Woodside Energy Ltd, a prototype of a 5D CAD system has been developed specifically for Liquefied Natural Gas (LNG) industry. The system was tested with the project data of an example module from an LNG plant provided by Woodside Energy Ltd. The functions of the system indude: visualization of schedule data and verification of cost in real time and facilitation of periodic planning and progress reporting. It is concluded that 5D CAD could be a very powerful project cost and progress control tool. (C) 2014 Elsevier BM. All rights reserved.
引用
收藏
页码:126 / 135
页数:10
相关论文
共 8 条
  • [1] Critical Factors Driving Construction Project Performance in Integrated 5D Building Information Modeling
    Sun, Hui
    Khoo, Terh Jing
    Esa, Muneera
    Mahdiyar, Amir
    Li, Jiguang
    BUILDINGS, 2024, 14 (09)
  • [2] Efficient project management of historical building groups: a BIM-based approach with critical chain method and 5D simulation
    Zhao, Yu
    Jing, Haotian
    Yu, Miao
    Li, Jiamin
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, : 826 - 839
  • [3] Effect of Project Control Practices on the Performance of Building Construction Companies in Uganda: A Case Study of the City of Kampala
    Tukundane, Hillary
    Yang, Yu
    BUILDINGS, 2024, 14 (06)
  • [4] Multidimensional Construction Planning and Agile Organized Project Execution-The 5D-PROMPT Method
    Leicht, David
    Castro-Fresno, Daniel
    Diaz, Joaquin
    Baier, Christian
    SUSTAINABILITY, 2020, 12 (16)
  • [5] OBTAINING THE BUDGET CONTINGENCY RESERVE THROUGH THE MONTE CARLO METHOD: STUDY OF A FERRY CONSTRUCTION PROJECT
    Para-Gonzalez, Lorena
    Mascaraque-Ramirez, Carlos
    Madrid, Ana E.
    BRODOGRADNJA, 2018, 69 (03): : 79 - 95
  • [6] Agile Project Management Styles and Control Ambidexterity in Agile Information Systems Development Projects: An Exploratory Case Study
    Virag, Peter
    Bernroider, Edward W. N.
    Remus, Ulrich
    JOURNAL OF THE ASSOCIATION FOR INFORMATION SYSTEMS, 2024, 25 (05): : 1274 - 1302
  • [7] The challenge of level of development in 4D/BIM simulation across AEC project lifecycle. A case study
    Boton, Conrad
    Kubicki, Sylvain
    Halin, Gilles
    CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS, 2015, 123 : 59 - 67
  • [8] CCC_implementing the construction control room on a fast-paced project: the case study of the Beirut port explosion
    Ezzeddine, Ali
    Shehab, Lynn
    Srour, Issam
    Power, William
    Zankoul, Emile
    Freiha, Elie
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (05) : 745 - 755