Three-Step Mathematical Model for Optimizing Rebar Cutting-Stock with Practical Application

被引:3
作者
Li, Yexue [1 ]
Wang, Jing [1 ]
Cao, Lintao [1 ]
Wei, Daojiang [1 ]
Wang, Yuanyuan [1 ]
机构
[1] Hubei Univ Arts & Sci, Dept Architecture & Civil Engn, Xiangyang 441053, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
Welding - Functions - Operations research;
D O I
10.1061/(ASCE)CO.1943-7862.0002283
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Theory of operations research is applied in this paper. The minimum total cost of steel reinforcement work was used as the objective function, and a three-step mathematical model to optimize the rebar cutting-stock was developed for building the finished rebars. Model I was applied to determine the whole raw material rebars that build the finished rebar. Models II and III were then applied to obtain the cut rebars needed to form the remaining rebar length of the finished rebar. The optimization results of the three-step model were combined to obtain a rebar cutting-stock list and method. Note the following results: (1) Considering comprehensively the effects of labor and material costs in the models led to the least rebar waste and number of welding spots, and thus the minimum total cost was reached. (2) In Model I, the minimum of cost sum of the rebar waste and welding spot count was taken as the objective to use the longer whole rebars first to minimize cutting and welding operations, and reducing the remaining rebar count reduced the subsequent calculation workload of Models II and III. (3) In model II, a constraint that every rebar section length be restricted to three nonoverlapping cases was imposed, which ensured that welding spots were not located in the midspan of a finished rebar. (4) In the practical case study considered, the rebar waste rate was 0.44%, and the finished rebars including 1 or 2 welding spots accounted for 90% of all finished rebars, which shows that the overall number of welding spots was small. The optimization not only clearly saved the rebar material cost but also decreased the labor cost of cutting and welding. (C) 2022 American Society of Civil Engineers.
引用
收藏
页数:10
相关论文
共 11 条
[1]   Setup and open-stacks minimization in one-dimensional stock cutting [J].
Belov, Gleb ;
Scheithauer, Guntram .
INFORMS JOURNAL ON COMPUTING, 2007, 19 (01) :27-35
[2]  
Berberler Murat., 2011, J KING SAUD UNIV SCI, V23, P69, DOI [DOI 10.1016/j.jksus.2010.06.009, 10.1016/j.jksus.2010.06.009]
[3]  
Chasparis G.C., 2017, PREPRINT
[4]   The usable leftover one-dimensional cutting stock problem-a priority-in-use heuristic [J].
Cherri, Adriana Cristina ;
Arenales, Marcos Nereu ;
Yanasse, Horacio Hideki .
INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2013, 20 (02) :189-199
[5]   A CAM system for one-dimensional stock cutting [J].
Cui, Yaodong .
ADVANCES IN ENGINEERING SOFTWARE, 2012, 47 (01) :7-16
[6]   C-Sets-based sequential heuristic procedure for the one-dimensional cutting stock problem with pattern reduction [J].
Cui, Yaodong ;
Liu, Zhiyong .
OPTIMIZATION METHODS & SOFTWARE, 2011, 26 (01) :155-167
[7]   Parallelized sequential value correction procedure for the one-dimensional cutting stock problem with multiple stock lengths [J].
Cui, Yi-Ping ;
Tang, Tian-Bing .
ENGINEERING OPTIMIZATION, 2014, 46 (10) :1352-1368
[8]  
Jahromi M.H.M.A., 2012, J. Ind. Eng. Int, V8, P24, DOI [10.1186/2251-712X-8-24, DOI 10.1186/2251-712X-8-24]
[9]   Combined cutting stock and lot-sizing problem with pattern setup [J].
Ma, Ning ;
Liu, Ya ;
Zhou, Zhili ;
Chu, Chengbin .
COMPUTERS & OPERATIONS RESEARCH, 2018, 95 :44-55
[10]   On the one-dimensional stock cutting problem in the paper tube industry [J].
Matsumoto, Kazuki ;
Umetani, Shunji ;
Nagamochi, Hiroshi .
JOURNAL OF SCHEDULING, 2011, 14 (03) :281-290