共 19 条
- [3] French S., 1982, Sequencing and Scheduling
- [4] OPTIMAL GROUP SCHEDULING AND MACHINING-SPEED DECISION UNDER DUE-DATE CONSTRAINTS [J]. JOURNAL OF ENGINEERING FOR INDUSTRY-TRANSACTIONS OF THE ASME, 1979, 101 (02): : 128 - 134
- [5] Ham I, 1985, GROUP TECHNOLOGY APP
- [6] Hitomi K., 1977, J ENG IND AUG, P759
- [7] HITOMI K, 1976, CIRP ANN-MANUF TECHN, V25, P419
- [9] GROUP PRODUCTION SCHEDULING FOR MINIMUM TOTAL TARDINESS .1. [J]. AIIE TRANSACTIONS, 1978, 10 (02): : 157 - 162
- [10] PAN JC, 1996, STOCHASTIC GROUP SCH