Managing project scope creep in construction industry

被引:11
作者
Ajmal, Mian M. [1 ]
Khan, Mehmood [1 ]
Gunasekaran, Angappa [2 ]
Helo, Petri T. [3 ]
机构
[1] Abu Dhabi Univ, Coll Business, Abu Dhabi, U Arab Emirates
[2] Calif State Univ Bakersfield, Sch Business & Publ Adm, Bakersfield, CA 93311 USA
[3] Univ Vaasa, Ind Management, Vaasa, Finland
关键词
Projects; Project management; Scope creep; Construction industry; UAE; SUCCESS FACTORS; COST OVERRUNS; MAJOR CAUSES; TIME; COMPLEXITY; STAKEHOLDERS; IMPACT; DELAY; DEFINITION; FAILURE;
D O I
10.1108/ECAM-07-2020-0568
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Project scope creep is a nightmare and nearly intolerable task. Most project managers struggle to curtail the expanse and degree of scope creep. This study examines different likely project scope creep factors associated with the construction industry projects. Design/methodology/approach After many brainstorming sessions with construction stakeholders, several project scope creep factors were identified. Then, a detailed survey was executed in big construction projects of the United Arab Emirates (UAE). The data were analyzed using exploratory factor analysis (EFA) and confirmatory factor analysis (CFA). Findings The results derived and validated five conspicuous factors leading to project scope creep. Respectively, the highest and the lowest impact on project scope appears to be imposed by tasks/specifications and complexity/uncertainty. Practical implications It offers crucial support to the project stakeholders in scrutinizing different factors that stand as hurdles to project success and allows them to seek remedies to resolve them. Originality/value It is among the first study in the region that identifies and validates the factors that hinder construction project success.
引用
收藏
页码:2786 / 2809
页数:24
相关论文
共 141 条
[1]  
Abbas W., 2017, UAE CONSTRUCTION SEC
[2]   Aggregation of factors causing cost overruns and time delays in large public construction projects Trends and implications [J].
Adam, Abderisak ;
Josephson, Per-Erik Bertil ;
Lindahl, Goran .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (03) :393-406
[3]   The professionals' perspective on the causes of project delay in the construction industry [J].
Agyekum-Mensah, George ;
Knight, Andrew David .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (05) :828-841
[4]  
Ahmed SM., 2003, P 39 ANN ASC C, P257
[5]   Exploring factors behind project scope creep - stakeholders' perspective [J].
Ajmal, Mian ;
Khan, Mehmood ;
Al-Yafei, Hanan .
INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2020, 13 (03) :483-504
[6]   Determining success factors in Abu Dhabi health care construction projects: customer and contractor perspectives [J].
Al Kuwaiti, Eisa ;
Ajmal, Mian M. ;
Hussain, Matloub .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2018, 18 (05) :430-445
[7]  
Al-Nuaimi A.S., 2010, J CONSTR ENG M ASCE, V136, P34
[8]   Why Do Information Technology Projects Fail? [J].
Alami, Adam .
INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERIS/PROJMAN / HCIST 2016, 2016, 100 :62-71
[9]  
Almajed AI, 2014, 2014 SCIENCE AND INFORMATION CONFERENCE (SAI), P984, DOI 10.1109/SAI.2014.6918305
[10]  
Amoatey CT, 2017, J FACIL MANAG, V15, P393, DOI 10.1108/JFM-11-2016-0052