A robust reliability-based scheduling for the maintenance activities during planned shutdown under uncertainty of activity duration

被引:9
作者
Moradi, Hadi [1 ]
Shadrokh, Shahram [1 ]
机构
[1] Sharif Univ Technol, Dept Ind Engn, Tehran, Iran
关键词
Maintenance scheduling; Planned shutdown; Reliability; Robust scheduling; Multi-mode project scheduling; Heuristic Algorithm; OPTIMIZATION; SYSTEMS; SAFETY; MODEL; IDENTIFICATION; MANAGEMENT; COMPONENTS;
D O I
10.1016/j.compchemeng.2019.106562
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Scheduling of the maintenance activities is considered, in which the duration of activities is uncertain, delivery date of the maintenance shutdown is predefined, and activities are multi-mode. The problem is a multi-mode time-constrained project scheduling problem (MTCPSP). The glycol regeneration unit in a gas refinery is as the case study. Based on the effect of equipment or sub-equipment on the system reliability, the importance value of equipment and sub-equipment within the system is determined, and these values are used in a heuristic algorithm as a priority rule for choosing activities in the schedule. Outcomes demonstrate the performance of the algorithm in early or on time delivery of the planned shutdown and reveal that if during the execution of the maintenance shutdown, it is forced to shorten the shutdown period, at each time before the deadline, the plant can be started up with the maximum possible improvement of the system reliability. (C) 2019 Elsevier Ltd. All rights reserved.
引用
收藏
页数:21
相关论文
共 73 条
  • [1] Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making
    Al-Najjar, B
    Alsyouf, I
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 84 (01) : 85 - 100
  • [2] The role of maintenance in improving companies' productivity and profitability
    Alsyouf, Imad
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 105 (01) : 70 - 78
  • [3] Medium-term maintenance turnaround planning under uncertainty for integrated chemical sites
    Amaran, Satyajith
    Zhang, Tong
    Sahinidis, Nikolaos V.
    Sharda, Bikram
    Bury, Scott J.
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2016, 84 : 422 - 433
  • [4] Long-term turnaround planning for integrated chemical sites
    Amaran, Satyajith
    Sahinidis, Nikolaos V.
    Sharda, Bikram
    Morrison, Matt
    Bury, Scott J.
    Miller, Scott
    Wassick, John M.
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2015, 72 : 145 - 158
  • [5] [Anonymous], 1991, SIMULATION MODELING
  • [6] Integrated maintenance planning and production scheduling with Markovian deteriorating machine conditions
    Bajestani, Maliheh Aramon
    Banjevic, Dragan
    Beck, J. Christopher
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (24) : 7377 - 7400
  • [7] Barlow R, 1975, Technometrics, V72, P304
  • [8] Birnbaum Z.W., 1969, MULTIVAR ANAL, V2, P58192
  • [9] MEASURES OF COMPONENT IMPORTANCE IN RELIABILITY THEORY
    BOLAND, PJ
    ELNEWEIHI, E
    [J]. COMPUTERS & OPERATIONS RESEARCH, 1995, 22 (04) : 455 - 463
  • [10] Unit Maintenance Scheduling: A robust model, based on fuzzy cost factors and peak loads
    Bozorgi, Ali
    Pedram, Mir Mohsen
    Yousefi, G. Reza
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2016, 79 : 142 - 149