Set-up of PEP-II longitudinal feedback systems for even/odd bunch spacings

被引:0
作者
Teytelman, D [1 ]
Fox, J [1 ]
机构
[1] Stanford Linear Accelerator Ctr, Stanford, CA 94309 USA
来源
BEAM INSTRUMENTATION WORKSHOP 2002 | 2002年 / 648卷
关键词
D O I
暂无
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
Feedback systems installed for control of coupled-bunch longitudinal instabilities in PEP-H collider have been designed to process bunch data at one half of the ring RF frequency. As a result these systems are ideally suited for controlling ring fills where only even or only odd RF buckets are populated (even bunch spacings). However in the operation of PEP-II per bunch charge considerations require fill patterns that alternately populate even and odd buckets. In this note we present a technique that allows to use existing hardware to provide feedback control of all bunches in such fills.
引用
收藏
页码:474 / 482
页数:9
相关论文
共 5 条
[1]  
Barry W, 1996, PROCEEDINGS OF THE 1995 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, P2681
[2]  
Oxoby G, 1994, EPAC 94 P, P1616
[3]  
SEEMAN J, 2001, EPAC 2000, P38
[4]  
Young A, 1998, PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3, P2368, DOI 10.1109/PAC.1997.751211
[5]  
1993, PEP 2 ASYMMETRIC B F