Cost impacts, scheduling impacts, and the claims process during construction

被引:32
作者
Chester, M [1 ]
Hendrickson, C [1 ]
机构
[1] Carnegie Mellon Univ, Dept Civil & Environm Engn, Pittsburgh, PA 15213 USA
关键词
D O I
10.1061/(ASCE)0733-9364(2005)131:1(102)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction mismanagement results in multiple problems that can cascade throughout the work force chain, affecting the schedule and leading to damages to multiple parties. Although the problem may start with a single subcontractor, it can result in all contractors feeling some impact to their work. In this paper, a case study is presented of a project with seven different mismanagement scenarios. A description of each scenario is provided as well as a quantification of the damages that result from the problem. A construction claims section is also included that addresses many of the issues that could result from a claim for each of the seven scenarios. A discussion is presented outlining possible preventative steps to minimize the damages from the problems presented.
引用
收藏
页码:102 / 107
页数:6
相关论文
共 16 条
[1]   Methodology for determining price variation in project execution [J].
Akpan, EOP ;
Igwe, O .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (05) :367-373
[2]  
ASEM M, 2002, J MANAGE ENG, V18, P84
[3]  
BRUNIES R, 2003, CALCULATING LOSS PRO
[4]   Reasons for cost and schedule increase for engineering design projects [J].
Chang, AST .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (01) :29-36
[5]  
CHESTER M, 2003, MICROSOFT PROJECT FI
[6]   A better way to estimate and mitigate disruption [J].
Finke, MR .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (06) :490-497
[7]   Identification and resolution of work space conflicts in building construction [J].
Guo, SJ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2002, 128 (04) :287-295
[8]   Impact of change orders on labor efficiency for electrical construction [J].
Hanna, AS ;
Russell, JS ;
Nordheim, EV ;
Bruggink, MJ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (04) :224-232
[9]  
IBBS CW, 1995, 108 U TEX AUST CONST
[10]   Generic methodology for analyzing delay claims [J].
Kartam, S .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (06) :409-419