共 50 条
- [4] Constraint programming model for resource-constrained assembly line balancing problem Soft Computing, 2020, 24 : 5367 - 5375
- [5] RESOURCE-CONSTRAINED MIXED MODEL ASSEMBLY LINE BALANCING IN AN APPAREL COMPANY TEKSTIL VE KONFEKSIYON, 2014, 24 (04): : 405 - 412
- [7] Robust optimization for resource-constrained project scheduling with uncertain activity durations Flexible Services and Manufacturing Journal, 2013, 25 : 175 - 205
- [9] Robust optimization for resource-constrained project scheduling with uncertain activity durations 2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 101 - 105
- [10] Robust scheduling and optimization for resource-constrained project scheduling problem with transfer times Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (12): : 4191 - 4205