Self-scheduling for energy and spinning reserve of wind/CSP plants by a MILP approach

被引:58
作者
Pousinho, H. M. I. [1 ,2 ]
Silva, H. [3 ]
Mendes, V. M. F. [1 ,3 ]
Collares-Pereira, M. [1 ]
Cabrita, C. Pereira [4 ]
机构
[1] Univ Evora, Dept Phys, P-7002554 Evora, Portugal
[2] Inst Super Tecn, IDMEC, LAETA, P-1049001 Lisbon, Portugal
[3] Inst Super Engn Lisboa, Dept Elect Engn & Automat, P-1950062 Lisbon, Portugal
[4] Univ Beira Interior, C1SE, P-6201001 Covilha, Portugal
关键词
Wind/CSP self-scheduling; Mixed-integer linear programming; Spinning reserve; Transmission constraints; CONCENTRATING SOLAR POWER; ELECTRICITY PRICE; STORAGE; GENERATION; MARKETS; SYSTEMS; UNCERTAINTIES; COORDINATION; OPERATION; SECURITY;
D O I
10.1016/j.energy.2014.10.039
中图分类号
O414.1 [热力学];
学科分类号
摘要
This paper is on the self-scheduling for a power producer taking part in day-ahead joint energy and spinning reserve markets and aiming at a short-term coordination of wind power plants with concentrated solar power plants having thermal energy storage. The short-term coordination is formulated as a mixed-integer linear programming problem given as the maximization of profit subjected to technical operation constraints, including the ones related to a transmission line. Probability density functions are used to model the variability of the hourly wind speed and the solar irradiation in regard to a negative correlation. Case studies based on an Iberian Peninsula wind and concentrated solar power plants are presented, providing the optimal energy and spinning reserve for the short-term self-scheduling in order to unveil the coordination benefits and synergies between wind and solar resources. Results and sensitivity analysis are in favour of the coordination, showing an increase on profit, allowing for spinning reserve, reducing the need for curtailment, increasing the transmission line capacity factor. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:524 / 534
页数:11
相关论文
共 48 条
[1]  
[Anonymous], 2014, CSP PLANT IBERDROLA
[2]  
[Anonymous], 2014, MARK OP EL MARK IB P
[3]  
[Anonymous], 2007, GEN ALG DIR SEARCH T
[4]   Transmission grid extensions during the build-up of a fully renewable pan-European electricity supply [J].
Becker, S. ;
Rodriguez, R. A. ;
Andresen, G. B. ;
Schramm, S. ;
Greiner, M. .
ENERGY, 2014, 64 :404-418
[5]   Stochastic security for operations planning with significant wind power generation [J].
Bouffard, Francois ;
Galiana, Francisco D. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2008, 23 (02) :306-316
[6]   Factors Influencing Wind Energy Curtailment [J].
Burke, Daniel J. ;
O'Malley, Mark J. .
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2011, 2 (02) :185-193
[7]   A new probabilistic method to estimate the long-term wind speed characteristics at a potential wind energy conversion site [J].
Carta, Jose A. ;
Velazquez, Sergio .
ENERGY, 2011, 36 (05) :2671-2685
[8]   Simulated annealing-based optimal wind-thermal coordination scheduling [J].
Chen, C. L. .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2007, 1 (03) :447-455
[9]   Effect of the transmission configuration of wind farms on their capacity factors [J].
Cheng, Hong-Ping ;
Yu, Ming-Ta .
ENERGY CONVERSION AND MANAGEMENT, 2013, 66 :326-335
[10]   Modelling the existing Irish energy-system to identify future energy costs and the maximum wind penetration feasible [J].
Connolly, D. ;
Lund, H. ;
Mathiesen, B. V. ;
Leahy, M. .
ENERGY, 2010, 35 (05) :2164-2173