Computer aided geometric feasible assembly sequence planning and optimizing

被引:65
作者
Su, Qiang [1 ]
机构
[1] Shanghai Jiao Tong Univ, Dept Ind Engn & Management, Shanghai 200030, Peoples R China
关键词
assembly; geometric feasibility; optimizing; precedence relation; sequence planning;
D O I
10.1007/s00170-006-0447-0
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Assembly sequence planning (ASP) is the foundation of the assembly process planning and design for assembly (DFA). In ASP, geometric feasibility is the prerequisite in the valid assembly sequences searching. The assembly precedence relations' (APRs) deriving and fulfilling are the essential tasks in the geometric feasible assembly sequence planning. In this paper, a systematical approach called geometric constraint analysis (GCA) is proposed and the corresponding software system is developed and integrated with CAD system. Using this system, only with a few mouse clicks on CAD draft, assembly precedence relations (APRs) can be derived correctly and completely. Then, all the geometric feasible assembly sequences can be inferred out automatically. Moreover, an optimal algorithm is designed and realized in the GCA method, by which, the most optimal assembly sequence in terms of the operation convenience can be found out from the immense geometric feasible sequences.
引用
收藏
页码:48 / 58
页数:11
相关论文
共 20 条
  • [1] AN INTEGRATED COMPUTER AID FOR GENERATING AND EVALUATING ASSEMBLY SEQUENCES FOR MECHANICAL PRODUCTS
    BALDWIN, DF
    ABELL, TE
    LUI, MCM
    DEFAZIO, TL
    WHITNEY, DE
    [J]. IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1991, 7 (01): : 78 - 94
  • [2] PRODUCT DESIGN FOR MANUFACTURE AND ASSEMBLY
    BOOTHROYD, G
    [J]. COMPUTER-AIDED DESIGN, 1994, 26 (07) : 505 - 520
  • [3] Bourjault A., 1984, Contribution a une approche methodologique de l'assemblage automatise: elaboration automatique des sequences operatoires
  • [4] A PROTOTYPE OF FEATURE-BASED DESIGN FOR ASSEMBLY
    DEFAZIO, TL
    EDSALL, AC
    GUSTAVSON, RE
    HERNANDEZ, J
    HUTCHINS, PM
    LEUNG, HW
    LUBY, SC
    METZINGER, RW
    NEVINS, JL
    TUNG, K
    WHITNEY, DE
    [J]. JOURNAL OF MECHANICAL DESIGN, 1993, 115 (04) : 723 - 734
  • [5] DELCHAMBRE A, 1992, COMPUTER AIDED ASSEM
  • [6] A CORRECT AND COMPLETE ALGORITHM FOR THE GENERATION OF MECHANICAL ASSEMBLY SEQUENCES
    DEMELLO, LSH
    SANDERSON, AC
    [J]. IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1991, 7 (02): : 228 - 240
  • [7] DEMELLO LSH, 1991, IEEE T ROBOTIC AUTOM, V7, P626
  • [8] Fan J, 2003, IEEE SYS MAN CYBERN, P4803
  • [9] Modelling, analysis and simulation for the design of a robotic assembly system
    Fuh, JYH
    Wong, YS
    Yee, CY
    Zhuang, L
    Neo, KS
    [J]. COMPUTER INTEGRATED MANUFACTURING SYSTEMS, 1996, 9 (01): : 19 - 31
  • [10] GOTTIPOLU RB, 1995, COMPUT TECHNOL, P125