Running safety of trains on half-through arch bridge during earthquake

被引:0
|
作者
Han, Y [1 ]
Xia, H [1 ]
机构
[1] Jiao Tong Univ, Sch Civil Engn & Architecture, Beijing 100044, Peoples R China
来源
PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 4, PTS A AND B | 2004年 / 4卷
关键词
running safety; half-through-type arch bridge; train; earthquakes; dynamic response;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper studies the dynamic responses of half-through-type arch bridges subjected to running trains and earthquakes. One scheme of a partially-concrete-filled steel box half-through-type arch bridge on the Beijing-Shanghai High-speed Railway in design is selected as engineering background. By using the computer simulation method, the whole histories of the train running through the arch bridge during typical earthquakes are simulated and the dynamic responses of the bridge and the vehicles are calculated. The results show that seismic excitations have significant effects on the safety and the passenger comfort when the train vehicles running through the half-through-type arch bridge.
引用
收藏
页码:1945 / 1951
页数:7
相关论文
共 50 条
  • [1] Dynamic Behavior Of Cfrp Hangers In a Half-Through Arch Bridge
    Li, Jinfeng
    Gao, Jing
    2019 INTERNATIONAL CONFERENCE ON SMART GRID AND ELECTRICAL AUTOMATION (ICSGEA), 2019, : 173 - 178
  • [2] Construction Controls for a Half-Through Tied Arch Bridge in China
    Tang, Chunyan
    Zheng, Li
    Zhang, Zhe
    STRUCTURAL ENGINEERING INTERNATIONAL, 2014, 24 (04) : 557 - 561
  • [3] Unique Design of Haixin Bridge, a Half-through Inclined Arch Bridge with a Curved Girder
    Ning, Pinghua
    Shangguan, Bing
    Qiu, Jianfa
    Tian, Jingxue
    Bao, Huanhui
    Hu, Huiyong
    Cao, Ke
    STRUCTURAL ENGINEERING INTERNATIONAL, 2023, 33 (04) : 635 - 639
  • [4] Seismic analysis of half-through steel truss arch bridge considering superstructure
    Li, Ruiqi
    Yuan, Xinzhe
    Yuan, Wancheng
    Dang, Xinzhi
    Shen, Guoyu
    STRUCTURAL ENGINEERING AND MECHANICS, 2016, 59 (03) : 387 - 401
  • [5] Force analysis of arch rib of half-through irregular CFST-tied arch bridge during construction stage
    Li, Jianning
    Sun, Xuexian
    Li, Ziqi
    Lu, Wei
    INTERNATIONAL JOURNAL OF CRITICAL INFRASTRUCTURES, 2021, 17 (04) : 298 - 316
  • [6] Impact effect analysis for hangers of half-through arch bridge by vehicle-bridge coupling
    Shao, Yuan
    Sun, Zong-guang
    Chen, Yi-fei
    Li, Huan-Lan
    STRUCTURAL MONITORING AND MAINTENANCE, 2015, 2 (01): : 65 - 75
  • [7] Simplified calculation method for suspension bridge deck system of half-through and through arch bridge under safety limit condition of suspender fracture
    Wu, Qingxiong
    Luo, Jianping
    Chen, Kangming
    Lin, Jiacheng
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2024, 57 (10): : 57 - 70
  • [8] Influence of transverse brace arrangement on dynamic characteristics of a half-through CFST arch bridge
    Yun, Di
    Zhang, Su-Mei
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2003, 35 (SUPPL.): : 259 - 262
  • [10] Research on the Tie Cable Replacement Method of Half-through Tied-Arch Bridge
    Shao, Guotao
    Zhan, Binglai
    Zhao, Zhenyin
    Xu, Yue
    Jin, Hui
    APPLIED SCIENCES-BASEL, 2022, 12 (16):