The aim of this paper is to examine and compare the results of engineering geological exploration works in the design phase and during the construction of tunnel Strazina. Tunel Strazina is located near the city of Omis on Zagreb-Split-Dubrovnik highway in Croatia. The interactive design method was applied in the tunnel design. This methodology integrates the empirical, rational and observational approaches in the geotechnical design of the tunnel. It allows for the thorough and comprehensive overview and problem solving during the construction. In addition, it minimizes the errors that may occur due to the limitations of each individual approach. Predicted underground excavation support solutions were done based on site investigation activities and other bases using the empirical and rational approaches. Geomechanical and Q classification were performed as a part of the empirical approach. Engineering-geological tunnel mapping was done during the excavation activities as a part of the geotechnical monitoring. Verification of the tunnel support system during the construction phase was done using the actual data obtained from the engineering-geological mapping and the monitoring. Thus, the actual rock mass quality along the tunnel was determined and the tunnel underground excavation support measures were optimized. Due to the complex conditions present in the rock mass, the discrepancy between estimated and actual rock mass conditions can hardly be avoided, and likewise, a certain amount of discrepancy between the predicted and actual support systems is also to be expected. The interaction of site investigation, design and construction, in addition to introducing the risk analysis, is essential for a more rational, safer and more economical construction. Development of methods and procedures for the preparation and control for each of the phases is important for a successful operation of each participant performing a completion of a particular phase, as well as for the project investor.
引用
收藏
页码:757 / 762
页数:6
相关论文
共 50 条
  • [1] Predicted versus actual rock mass conditions: A review of four tunnel projects in Nepal Himalaya
    Panthi, Krishna Kanta
    Nilsen, Bjorn
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2007, 22 (02) : 173 - 184
  • [2] A comparison of predicted and actual tunnel behaviour in the Istanbul Metro, Turkey
    Dalgiç, S
    ENGINEERING GEOLOGY, 2002, 63 (1-2) : 69 - 82
  • [3] An account of tunnel support systems for soft rock mass conditions
    Ongodia, J. E.
    Kalumba, D.
    Mutikanga, H. E.
    PROCEEDINGS OF THE FIRST SOUTHERN AFRICAN GEOTECHNICAL CONFERENCE, 2016, : 205 - 211
  • [4] Predicted and actual risks in construction of the Mercer Street Tunnel
    Abramson, L
    Cochran, J
    Handewith, H
    MacBriar, T
    NORTH AMERICAN TUNNELING 2002, 2002, : 211 - 217
  • [5] Comparison of geological conditions predicted from tunnel boreholes and found in situ
    Dalgıç S.
    Bulletin of Engineering Geology and the Environment, 2000, 58 (2) : 115 - 123
  • [6] A COMPARISON OF PREDICTED WITH ACTUAL RESULTS OF PROBATION
    Monachesi, Elio D.
    AMERICAN SOCIOLOGICAL REVIEW, 1945, 10 (01) : 26 - 31
  • [7] Comparison of predicted and actual states in tunnels: lessons to be learned from the Gerede Water Transmission Tunnel, Turkey
    Apaydin, Ahmet
    QUARTERLY JOURNAL OF ENGINEERING GEOLOGY AND HYDROGEOLOGY, 2021, 54 (01)
  • [8] A comparison between actual and predicted evacuation times
    Olsson, PÅ
    Regan, MA
    SAFETY SCIENCE, 2001, 38 (02) : 139 - 145
  • [9] Comparison of predicted and actual consequences of missense mutations
    Miosge, Lisa A.
    Field, Matthew A.
    Sontani, Yovina
    Cho, Vicky
    Johnson, Simon
    Palkova, Anna
    Balakishnan, Bhavani
    Liang, Rong
    Zhang, Yafei
    Lyon, Stephen
    Beutler, Bruce
    Whittle, Belinda
    Bertram, Edward M.
    Enders, Anselm
    Goodnow, Christopher C.
    Andrews, T. Daniel
    PROCEEDINGS OF THE NATIONAL ACADEMY OF SCIENCES OF THE UNITED STATES OF AMERICA, 2015, 112 (37) : E5189 - E5198
  • [10] Actual conditions of an eighty year old, totally unsupported tunnel compared with rock support design using current rock classification systems
    Hansen, LM
    EUROCK '96/TORINO/ITALY - PREDICTION AND PERFORMANCE IN ROCK MECHANICS AND ROCK ENGINEERING, PROCEEDINGS, VOLS 1 AND 2, 1996, : 819 - 824